×
Author ID: lee.chung-yee Recent zbMATH articles by "Lee, Chung-Yee"
Published as: Lee, Chung-Yee; Lee, C.-Y.; Lee, Chung Yee; Lee, C. Y.
all top 5

Co-Authors

12 single-authored
8 Çetinkaya, Sıla
7 Vairaktarakis, George L.
6 Uzsoy, Reha
5 Hsu, Vernon Ning
5 Jaruphongsa, Wikrom
4 Cai, Xiaoqiang
4 Chen, Zhi-Long
4 Li, Chung-Lun
4 Lin, Chen-Sin
4 Oden, John Tinsley
3 Chen, Hsin-Der
3 Hearn, Donald W.
3 Herrmann, Jeffrey W.
3 Lei, Lei
3 Liman, Surya Danusaputro
3 Yu, Gang
2 Anger, Frank D.
2 Chen, Jian
2 Chow, Yuan-Chieh
2 Denardo, Eric V.
2 Fu, Ke
2 Hwang, Jing-Jang
2 Kong, Qingxia
2 Leung, Joseph Y.-T.
2 Li, Xi
2 Lu, Tao
2 Martin-Vega, Louis A.
2 Qi, Xiangtong
2 So, Kut C.
2 Teo, Chungpiaw
2 Yang, Ruina
2 Zhang, Juliang
2 Zheng, Zhichao
2 Zhou, Weihua
1 Ainsworth, Mark
1 Akyüz, M. Hakan
1 Angelis, D. I.
1 Benjaafar, Saif
1 Bharara, A.
1 Chandru, Vijaya
1 Chang, Yung-Chia
1 Chao, Xiuli
1 Chen, Bo
1 Chen, Feng
1 Chen, Jian-er
1 Cheng, Tai-Chiu Edwin
1 Danusaputro, Surya Liman
1 de Matta, Renato
1 de Werra, Dominique
1 Ebeling, A. C.
1 Elhafsi, Mohsen
1 Federgruen, Awi
1 Fransoo, Jan C.
1 Gandhi, Mukesh V.
1 Graves, Gregory H.
1 Gribkovskaia, Irina V.
1 He, Yong
1 Hwang, Hark-Chin
1 Krämer, Franz-Josef
1 Kuske, Rachel A.
1 Lee, Hau Leung
1 Leon, V. Jorge
1 Lin, Bertrand Miao-Tsong
1 Liu, Qian
1 Marschall, Erich
1 Massey, J. David
1 Mutlu, Fatih
1 Ng, Chung W.
1 Ou, Jinwen
1 Pinedo, Michael L.
1 Piramuthu, Selwyn
1 Rottschäfer, Vivi
1 Setayeshgar, Leila
1 Snowdon, Jane L.
1 Strusevich, Vitaly A.
1 Tang, Guochun
1 Thompson, Brian S.
1 Wagelmans, Albert P. M.
1 Wang, Haiyan
1 Wong, Chak-Kuen
1 Xu, Zhou
1 Young, Gilbert H.
1 Yu, Mingzhu
1 Zhang, Guochuan
1 Zheng, Song
1 Zhou, Sean X.

Publications by Year

Citations contained in zbMATH Open

107 Publications have been cited 2,036 times in 1,331 Documents Cited by Year
Efficient algorithms for scheduling semiconductor burn-in operations. Zbl 0759.90046
Lee, Chung-Yee; Uzsoy, Reha; Martin-Vega, Louis A.
166
1992
Machine scheduling with an availability constraint. Zbl 0870.90071
Lee, Chung-Yee
128
1996
Machine scheduling with transportation considerations. Zbl 0979.90055
Lee, Chung-Yee; Chen, Zhi-Long
102
2001
Minimizing makespan on a single batch processing machine with dynamic job arrivals. Zbl 0939.90537
Lee, C.-Y.; Uzsoy, R.
81
1999
Stock replenishment and shipment scheduling for vendor-managed inventory systems. Zbl 1231.90016
Çetinkaya, Sila; Lee, Chung-Yee
70
2000
Machine scheduling with job delivery coordination. Zbl 1067.90041
Chang, Yung-Chia; Lee, Chung-Yee
67
2004
Current trends in deterministic scheduling. Zbl 0890.90102
Lee, Chung-Yee; Lei, Lei; Pinedo, Michael
65
1997
Single machine flow-time scheduling with scheduled maintenance. Zbl 0738.68043
Lee, Chung-Yee; Liman, Surya Danusaputro
64
1992
Machine scheduling with a rate-modifying activity. Zbl 0983.90020
Lee, C.-Y.; Leon, V. J.
61
2001
Parallel machines scheduling with nonsimultaneous machine available time. Zbl 0722.90032
Lee, Chung-Yee
60
1991
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Zbl 0783.90054
Lee, Chung-Yee; Cheng, T. C. E.; Lin, B. M. T.
58
1993
Minimizing makespan in hybrid flowshops. Zbl 0812.90066
Lee, Chung-Yee; Vairaktarakis, George L.
55
1994
Minimizing total completion time on a batch processing machine with job families. Zbl 0771.90054
Chandru, Vijaya; Lee, Chung-Yee; Uzsoy, Reha
53
1993
Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint. Zbl 0882.90069
Lee, Chung-Yee
51
1997
Two-machine flowshop scheduling with availability constraints. Zbl 0971.90031
Lee, Chung-Yee
47
1999
Scheduling maintenance and semiresumable jobs on a single machine. Zbl 0931.90015
Graves, Gregory H.; Lee, Chung-Yee
40
1999
Scheduling jobs and maintenance activities on parallel machines. Zbl 0973.90034
Lee, Chung-Yee; Chen, Zhi-Long
39
2000
Minimizing makespan on a single batch processing machine with nonidentical job sizes. Zbl 1027.90041
Zhang, Guochuan; Cai, Xiaoqiang; Lee, C.-Y.; Wong, C. K.
37
2001
A dynamic lot-sizing model with demand time windows. Zbl 1232.90189
Lee, Chung-Yee; Çetinkaya, Sila; Wagelmans, Albert P. M.
36
2001
Scheduling arrivals to a stochastic service delivery system using copositive cones. Zbl 1273.90090
Kong, Qingxia; Lee, Chung-Yee; Teo, Chung-Piaw; Zheng, Zhichao
36
2013
Scheduling precedence graphs in systems with interprocessor communication times. Zbl 0677.68026
Hwang, Jing-Jang; Chow, Yuan-Chieh; Anger, Frank D.; Lee, Chung-Yee
31
1989
A dynamic model for inventory lot sizing and outbound shipment scheduling at a third-party warehouse. Zbl 1165.90324
Lee, Chung-Yee; Çetinkaya, Sila; Jaruphongsa, Wikrom
31
2003
Machine scheduling with deliveries to multiple customer locations. Zbl 1132.90329
Li, Chung-Lun; Vairaktarakis, George; Lee, Chung-Yee
31
2005
Local a posteriori error estimators for variational inequalities. Zbl 0768.65032
Ainsworth, Mark; Oden, J. Tinsley; Lee, C. Y.
30
1993
Capacitated two-parallel machines scheduling to minimize sum of job completion times. Zbl 0778.90028
Lee, Chung-Yee; Liman, Surya Danusaputro
30
1993
On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date. Zbl 0842.90060
Herrmann, Jeffrey W.; Lee, Chung-Yee
30
1993
Scheduling with agreeable release times and due dates on a batch processing machine. Zbl 0929.90038
Li, Chung-Lun; Lee, Chung-Yee
29
1997
Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date. Zbl 0717.90037
Lee, Chung-Yee; Danusaputro, Surya Liman; Lin, Chen-Sin
28
1991
Single-machine scheduling with maintenance and repair rate-modifying activities. Zbl 0989.90036
Lee, Chung-Yee; Lin, Chen-Sin
27
2001
Complexity of single machine hierarchical scheduling: A survey. Zbl 0968.90521
Lee, Chung-Yee; Vairaktarakis, George L.
24
1993
The dynamic lot size model with quantity discount. Zbl 0727.90020
Federgruen, Awi; Lee, Chung-Yee
23
1990
Multiprocessor scheduling: Combining LPT and MULTIFIT. Zbl 0655.90036
Lee, Chung-Yee; Massey, J. David
22
1988
Minimizing the makespan in a two-machine cross-docking flow shop problem. Zbl 1152.90433
Chen, Feng; Lee, Chung-Yee
22
2009
Representation of switching circuits by binary-decision programs. Zbl 0222.94042
Lee, C. Y.
21
1959
Scheduling patients in an ambulatory surgical center. Zbl 1030.90034
Hsu, Vernon Ning; de Matta, Renato; Lee, Chung-Yee
21
2003
A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights. Zbl 0838.90066
Lee, C. Y.; Choi, J. Y.
20
1995
A posteriori error estimation of \(h-p\) finite element approximations of frictional contact problems. Zbl 0847.73062
Lee, C. Y.; Oden, J. T.
20
1994
A new dynamic programming algorithm for the single item capacitated dynamic lot size model. Zbl 0812.90037
Chen, Hsin-Der; Hearn, Donald W.; Lee, Chung-Yee
20
1994
Production and transport logistics scheduling with two transport mode choices. Zbl 1278.90175
Wang, Haiyan; Lee, Chung-Yee
19
2005
A note on ”parallel machine scheduling with non-simultaneous machine available time”. Zbl 0947.90047
Lee, Chung-Yee; He, Yong; Tang, Guochun
18
2000
Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases. Zbl 0991.90523
Lee, Chung-Yee; Lei, Lei
18
2001
A comparison of outbound dispatch policies for integrated inventory and transportation decisions. Zbl 1116.90005
Çetinkaya, Sıla; Mutlu, Fatih; Lee, Chung-Yee
18
2006
A new dynamic programming algorithm for the parallel machines total weighted completion time problem. Zbl 0760.90057
Lee, Chung-Yee; Uzsoy, Reha
17
1992
General multiprocessor task scheduling. Zbl 0922.90085
Chen, Jianer; Lee, Chung-Yee
15
1999
Job shop scheduling with a genetic algorithm and machine learning. Zbl 0953.90524
Lee, C.-Y.; Piramuthu, S.; Tsai, Y.-K.
15
1997
Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine. Zbl 0745.90042
Uzsoy, Reha; Lee, Chung-Yee; Martin-Vega, Louis A.
15
1992
Logistics scheduling with batching and transportation. Zbl 1146.90027
Chen, Bo; Lee, Chung-Yee
14
2008
Optimal control of an assembly system with multiple stages and multiple demand classes. Zbl 1227.93128
Benjaafar, Saif; ElHafsi, Mohsen; Lee, Chung-Yee; Zhou, Weihua
14
2011
Parallel machine scheduling with a common due window. Zbl 1007.90024
Chen, Zhi-Long; Lee, Chung-Yee
14
2002
Due window scheduling for parallel machines. Zbl 0810.90073
Krämer, F.-J.; Lee, C.-Y.
14
1994
Parallel machine scheduling with multiple unloading servers. Zbl 1193.90108
Ou, Jinwen; Qi, Xiangtong; Lee, Chung-Yee
14
2010
Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing. Zbl 1232.90060
Hsu, Vernon Ning; Lee, Chung Yee; So, Kut C.
13
2006
Inventory replenishment model: lot sizing versus just-in-time delivery. Zbl 1054.90010
Lee, Chung-Yee
13
2004
A priori error estimation of \(hp\)-finite element approximations of frictional contact problems with normal compliance. Zbl 0772.73078
Lee, C. Y.; Oden, J. Tinsley
13
1993
Theory and approximation of quasistatic frictional contact problems. Zbl 0783.73083
Lee, C. Y.; Oden, J. T.
13
1993
Optimal outbound dispatch policies: Modeling inventory and cargo capacity. Zbl 1014.90002
Çetinkaya, Sıla; Lee, Chung-Yee
13
2002
A mathematical formulation and efficient heuristics for the dynamic container relocation problem. Zbl 1411.90197
Akyüz, M. Hakan; Lee, Chung-Yee
12
2014
Workforce planning in mixed model assembly systems. Zbl 0887.90081
Lee, Chung-Yee; Vairaktarakis, George L.
11
1997
A dynamic programming algorithm for dynamic lot size models with piecewise linear costs. Zbl 0812.90038
Chen, Hsin-Der; Hearn, Donald W.; Lee, Chung-Yee
11
1994
Parallel-machine scheduling under potential disruption. Zbl 1145.90023
Lee, Chung-Yee; Yu, Gang
11
2008
Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity. Zbl 1167.90326
Fu, Ke; Hsu, Vernon Ning; Lee, Chung-Yee
10
2006
Rolling planning horizons: Error bounds for the dynamic lot size model. Zbl 0631.90018
Lee, Chung-Yee; Denardo, Eric V.
9
1986
Appointment sequencing: why the smallest-variance-first rule may not be optimal. Zbl 1394.90323
Kong, Qingxia; Lee, Chung-Yee; Teo, Chung-Piaw; Zheng, Zhichao
9
2016
Multiprocessor scheduling with interprocessor communication delays. Zbl 0644.68046
Lee, Chung-Yee; Hwang, Jing-Jang; Chow, Yuan-Chieh; Anger, Frank D.
7
1988
A two-echelon inventory optimization model with demand time window considerations. Zbl 1082.90003
Jaruphongsa, Wikrom; Çetinkaya, Sila; Lee, Chung-Yee
7
2004
The loss-averse newsvendor problem with supply options. Zbl 1411.90027
Lee, Chung-Yee; Li, Xi; Yu, Mingzhu
7
2015
Minimizing total completion time in two-processor task systems with prespecified processor allocations. Zbl 0914.90158
Cai, Xiaoqiang; Lee, Chung-Yee; Li, Chung-Lun
6
1998
Solving a class scheduling problem with a genetic algorithm. Zbl 0843.90057
Herrmann, Jeffrey W.; Lee, Chung-Yee
6
1995
Single machine scheduling under potential disruption. Zbl 1278.90163
Lee, Chung-Yee; Yu, Gang
6
2007
Patterns and coherence resonance in the stochastic Swift-Hohenberg equation with Pyragas control: the Turing bifurcation case. Zbl 1380.93230
Kuske, R.; Lee, C. Y.; Rottschäfer, V.
6
2018
A turing machine which prints its own code script. Zbl 0116.33701
Lee, C. Y.
6
1963
Economic lot sizing: the capacity reservation model. Zbl 1287.90006
Lee, Chung-Yee; Li, Xi
6
2013
Two machine scheduling under disruptions with transportation considerations. Zbl 1154.90468
Lee, Chung-Yee; Leung, Joseph Y-T.; Yu, Gang
5
2006
Cross-training effectiveness and profitability. Zbl 0899.90094
Ebeling, A. C.; Lee, C.-Y.
5
1994
Stability of condensate flow down a vertical wall. Zbl 0257.76045
Marschall, E.; Lee, C. Y.
5
1973
Dynamic lot-sizing problem with demand time windows and container-based transportation cost. Zbl 1145.90004
Jaruphongsa, Wikrom; Lee, Chung-Yee
5
2008
Three is easy, two is hard: Open shop sum-batch scheduling problem refined. Zbl 1133.90339
Gribkovskaia, Irina V.; Lee, Chung-Yee; Strusevich, Vitaly A.; de Werra, Dominique
5
2006
Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions. Zbl 1180.90012
Jaruphongsa, Wikrom; Çetinkaya, Sila; Lee, Chung-Yee
5
2007
Workface planning in synchronous production systems. Zbl 1008.90017
Vairaktarakis, George L.; Cai, Xiaoqiang; Lee, Chung-Yee
4
2002
Inventory control problem with freight cost and stochastic demand. Zbl 1176.90043
Zhang, Ju-Liang; Lee, Chung-Yee; Chen, Jian
4
2009
Error bound of a heuristic for the common due date scheduling problem. Zbl 0789.90043
Liman, Surya Danusaputro; Lee, Chung-Yee
4
1993
Approximation methods for the analysis of a multicomponent, multiproduct assemble-to-order system. Zbl 1241.90061
Fu, Ke; Hsu, Vernon N.; Lee, Chung-Yee
4
2011
Preemptive multiprocessor order scheduling to minimize total weighted flowtime. Zbl 1170.90394
Leung, Joseph Y.-T.; Lee, C. Y.; Ng, C. W.; Young, G. H.
3
2008
A classification of static scheduling problems. Zbl 0968.90513
Herrmann, Jeffrey W.; Lee, Chung-Yee; Snowdon, Jane L.
3
1993
Strategic investment analysis using activity based costing concepts and analytical hiearchy process techniques. Zbl 0947.90545
Angelis, D. I.; Lee, C.-Y.
3
1996
Invariant polynomials of Weyl groups and applications to the centres of universal enveloping algebras. Zbl 0249.17004
Lee, C.-Y.
3
1974
Optimization of processing and delivery decisions involving third-party machines. Zbl 1224.90016
Cai, Xiaoqiang; Lee, Chung-Yee; Vairaktarakis, George L.
3
2005
Error bound for the dynamic lot size model with backlogging. Zbl 0717.90023
Denardo, Eric V.; Lee, Chung-Yee
3
1991
Compensation plan for competing salespersons under asymmetric information. Zbl 1292.91105
Lee, Chung-Yee; Yang, Ruina
3
2013
Inventory competition with yield reliability improvement. Zbl 1310.90009
Lee, Chung-Yee; Lu, Tao
3
2015
Managing components for assemble-to-order products with lead-time-dependent pricing: the full-shipment model. Zbl 1143.90304
Hsu, Vernon Ning; Lee, Chung Yee; So, Kut C.
3
2007
New lower bound and exact method for the continuous berth allocation problem. Zbl 1443.90197
Xu, Zhou; Lee, Chung-Yee
3
2018
Capacitated dynamic lot-sizing problem with delivery/production time windows. Zbl 1202.90113
Hwang, H.-C.; Jaruphongsa, W.; Çetinkaya, S.; Lee, C.-Y.
3
2010
Optimal control of a capacitated inventory system with multiple demand classes. Zbl 1210.90017
Zhou, Weihua; Lee, Chung-Yee; Wu, David
2
2011
Minimizing the error bound for the dynamic lot size model. Zbl 0836.90066
Chen, Hsin-Der; Hearn, Donald W.; Lee, Chung-Yee
2
1995
On the fixed interval due-date scheduling problem. Zbl 0846.90051
Lee, Chung-Yee; Li, Chung-Lun
2
1996
Optimal transportation policies for production/inventory systems with an unreliable and a reliable carrier. Zbl 1180.90018
Zhou, Sean X.; Chao, Xiuli; Lee, Chung-Yee
2
2009
Analysis of algorithms for two-stage flowshops with multi-processor task flexibility. Zbl 1055.90041
Vairaktarakis, George L.; Lee, Chung-Yee
2
2004
On the branching theorem of the symplectic groups. Zbl 0364.20049
Lee, C. Y.
2
1974
The large deviation principle for a stochastic Korteweg-de Vries equation with additive noise. Zbl 1342.60037
Lee, C. Y.; Setayeshgar, L.
2
2015
A carrier-shipper contract under asymmetric information in the ocean transport industry. Zbl 1411.90062
Yang, Ruina; Lee, Chung-Yee; Liu, Qian; Zheng, Song
1
2019
Patterns and coherence resonance in the stochastic Swift-Hohenberg equation with Pyragas control: the Turing bifurcation case. Zbl 1380.93230
Kuske, R.; Lee, C. Y.; Rottschäfer, V.
6
2018
New lower bound and exact method for the continuous berth allocation problem. Zbl 1443.90197
Xu, Zhou; Lee, Chung-Yee
3
2018
Carrier portfolio management for shipping seasonal products. Zbl 1384.90093
Lu, Tao; Fransoo, Jan C.; Lee, Chung-Yee
1
2017
Appointment sequencing: why the smallest-variance-first rule may not be optimal. Zbl 1394.90323
Kong, Qingxia; Lee, Chung-Yee; Teo, Chung-Piaw; Zheng, Zhichao
9
2016
The loss-averse newsvendor problem with supply options. Zbl 1411.90027
Lee, Chung-Yee; Li, Xi; Yu, Mingzhu
7
2015
Inventory competition with yield reliability improvement. Zbl 1310.90009
Lee, Chung-Yee; Lu, Tao
3
2015
The large deviation principle for a stochastic Korteweg-de Vries equation with additive noise. Zbl 1342.60037
Lee, C. Y.; Setayeshgar, L.
2
2015
A mathematical formulation and efficient heuristics for the dynamic container relocation problem. Zbl 1411.90197
Akyüz, M. Hakan; Lee, Chung-Yee
12
2014
Scheduling arrivals to a stochastic service delivery system using copositive cones. Zbl 1273.90090
Kong, Qingxia; Lee, Chung-Yee; Teo, Chung-Piaw; Zheng, Zhichao
36
2013
Economic lot sizing: the capacity reservation model. Zbl 1287.90006
Lee, Chung-Yee; Li, Xi
6
2013
Compensation plan for competing salespersons under asymmetric information. Zbl 1292.91105
Lee, Chung-Yee; Yang, Ruina
3
2013
Coordinated pricing and inventory control problems with capacity constraints and fixed ordering cost. Zbl 1407.90043
Zhang, Ju-liang; Chen, Jian; Lee, Chung-Yee
2
2012
Optimal control of an assembly system with multiple stages and multiple demand classes. Zbl 1227.93128
Benjaafar, Saif; ElHafsi, Mohsen; Lee, Chung-Yee; Zhou, Weihua
14
2011
Approximation methods for the analysis of a multicomponent, multiproduct assemble-to-order system. Zbl 1241.90061
Fu, Ke; Hsu, Vernon N.; Lee, Chung-Yee
4
2011
Optimal control of a capacitated inventory system with multiple demand classes. Zbl 1210.90017
Zhou, Weihua; Lee, Chung-Yee; Wu, David
2
2011
Parallel machine scheduling with multiple unloading servers. Zbl 1193.90108
Ou, Jinwen; Qi, Xiangtong; Lee, Chung-Yee
14
2010
Capacitated dynamic lot-sizing problem with delivery/production time windows. Zbl 1202.90113
Hwang, H.-C.; Jaruphongsa, W.; Çetinkaya, S.; Lee, C.-Y.
3
2010
Minimizing the makespan in a two-machine cross-docking flow shop problem. Zbl 1152.90433
Chen, Feng; Lee, Chung-Yee
22
2009
Inventory control problem with freight cost and stochastic demand. Zbl 1176.90043
Zhang, Ju-Liang; Lee, Chung-Yee; Chen, Jian
4
2009
Optimal transportation policies for production/inventory systems with an unreliable and a reliable carrier. Zbl 1180.90018
Zhou, Sean X.; Chao, Xiuli; Lee, Chung-Yee
2
2009
Vehicle scheduling with combinable delivery and pickup operations. Zbl 1176.90228
Lee, Chung-Yee; Qi, Xiangtong
1
2009
Logistics scheduling with batching and transportation. Zbl 1146.90027
Chen, Bo; Lee, Chung-Yee
14
2008
Parallel-machine scheduling under potential disruption. Zbl 1145.90023
Lee, Chung-Yee; Yu, Gang
11
2008
Dynamic lot-sizing problem with demand time windows and container-based transportation cost. Zbl 1145.90004
Jaruphongsa, Wikrom; Lee, Chung-Yee
5
2008
Preemptive multiprocessor order scheduling to minimize total weighted flowtime. Zbl 1170.90394
Leung, Joseph Y.-T.; Lee, C. Y.; Ng, C. W.; Young, G. H.
3
2008
A new pseudo-Gaussian-based recurrent fuzzy CMAC model for dynamic systems processing. Zbl 1168.93414
Wang, D.-Y.; Lin, C.-J.; Lee, C.-Y.
1
2008
Single machine scheduling under potential disruption. Zbl 1278.90163
Lee, Chung-Yee; Yu, Gang
6
2007
Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions. Zbl 1180.90012
Jaruphongsa, Wikrom; Çetinkaya, Sila; Lee, Chung-Yee
5
2007
Managing components for assemble-to-order products with lead-time-dependent pricing: the full-shipment model. Zbl 1143.90304
Hsu, Vernon Ning; Lee, Chung Yee; So, Kut C.
3
2007
A comparison of outbound dispatch policies for integrated inventory and transportation decisions. Zbl 1116.90005
Çetinkaya, Sıla; Mutlu, Fatih; Lee, Chung-Yee
18
2006
Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing. Zbl 1232.90060
Hsu, Vernon Ning; Lee, Chung Yee; So, Kut C.
13
2006
Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity. Zbl 1167.90326
Fu, Ke; Hsu, Vernon Ning; Lee, Chung-Yee
10
2006
Two machine scheduling under disruptions with transportation considerations. Zbl 1154.90468
Lee, Chung-Yee; Leung, Joseph Y-T.; Yu, Gang
5
2006
Three is easy, two is hard: Open shop sum-batch scheduling problem refined. Zbl 1133.90339
Gribkovskaia, Irina V.; Lee, Chung-Yee; Strusevich, Vitaly A.; de Werra, Dominique
5
2006
Machine scheduling with deliveries to multiple customer locations. Zbl 1132.90329
Li, Chung-Lun; Vairaktarakis, George; Lee, Chung-Yee
31
2005
Production and transport logistics scheduling with two transport mode choices. Zbl 1278.90175
Wang, Haiyan; Lee, Chung-Yee
19
2005
Optimization of processing and delivery decisions involving third-party machines. Zbl 1224.90016
Cai, Xiaoqiang; Lee, Chung-Yee; Vairaktarakis, George L.
3
2005
Machine scheduling with job delivery coordination. Zbl 1067.90041
Chang, Yung-Chia; Lee, Chung-Yee
67
2004
Inventory replenishment model: lot sizing versus just-in-time delivery. Zbl 1054.90010
Lee, Chung-Yee
13
2004
A two-echelon inventory optimization model with demand time window considerations. Zbl 1082.90003
Jaruphongsa, Wikrom; Çetinkaya, Sila; Lee, Chung-Yee
7
2004
Analysis of algorithms for two-stage flowshops with multi-processor task flexibility. Zbl 1055.90041
Vairaktarakis, George L.; Lee, Chung-Yee
2
2004
A dynamic model for inventory lot sizing and outbound shipment scheduling at a third-party warehouse. Zbl 1165.90324
Lee, Chung-Yee; Çetinkaya, Sila; Jaruphongsa, Wikrom
31
2003
Scheduling patients in an ambulatory surgical center. Zbl 1030.90034
Hsu, Vernon Ning; de Matta, Renato; Lee, Chung-Yee
21
2003
Parallel machine scheduling with a common due window. Zbl 1007.90024
Chen, Zhi-Long; Lee, Chung-Yee
14
2002
Optimal outbound dispatch policies: Modeling inventory and cargo capacity. Zbl 1014.90002
Çetinkaya, Sıla; Lee, Chung-Yee
13
2002
Workface planning in synchronous production systems. Zbl 1008.90017
Vairaktarakis, George L.; Cai, Xiaoqiang; Lee, Chung-Yee
4
2002
A JPEG-like texture compression with adaptive quantization for 3D graphics application. Zbl 1021.68592
Chen, C.-H.; Lee, C.-Y.
1
2002
Machine scheduling with transportation considerations. Zbl 0979.90055
Lee, Chung-Yee; Chen, Zhi-Long
102
2001
Machine scheduling with a rate-modifying activity. Zbl 0983.90020
Lee, C.-Y.; Leon, V. J.
61
2001
Minimizing makespan on a single batch processing machine with nonidentical job sizes. Zbl 1027.90041
Zhang, Guochuan; Cai, Xiaoqiang; Lee, C.-Y.; Wong, C. K.
37
2001
A dynamic lot-sizing model with demand time windows. Zbl 1232.90189
Lee, Chung-Yee; Çetinkaya, Sila; Wagelmans, Albert P. M.
36
2001
Single-machine scheduling with maintenance and repair rate-modifying activities. Zbl 0989.90036
Lee, Chung-Yee; Lin, Chen-Sin
27
2001
Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases. Zbl 0991.90523
Lee, Chung-Yee; Lei, Lei
18
2001
Stock replenishment and shipment scheduling for vendor-managed inventory systems. Zbl 1231.90016
Çetinkaya, Sila; Lee, Chung-Yee
70
2000
Scheduling jobs and maintenance activities on parallel machines. Zbl 0973.90034
Lee, Chung-Yee; Chen, Zhi-Long
39
2000
A note on ”parallel machine scheduling with non-simultaneous machine available time”. Zbl 0947.90047
Lee, Chung-Yee; He, Yong; Tang, Guochun
18
2000
Minimizing makespan on a single batch processing machine with dynamic job arrivals. Zbl 0939.90537
Lee, C.-Y.; Uzsoy, R.
81
1999
Two-machine flowshop scheduling with availability constraints. Zbl 0971.90031
Lee, Chung-Yee
47
1999
Scheduling maintenance and semiresumable jobs on a single machine. Zbl 0931.90015
Graves, Gregory H.; Lee, Chung-Yee
40
1999
General multiprocessor task scheduling. Zbl 0922.90085
Chen, Jianer; Lee, Chung-Yee
15
1999
Minimizing total completion time in two-processor task systems with prespecified processor allocations. Zbl 0914.90158
Cai, Xiaoqiang; Lee, Chung-Yee; Li, Chung-Lun
6
1998
Current trends in deterministic scheduling. Zbl 0890.90102
Lee, Chung-Yee; Lei, Lei; Pinedo, Michael
65
1997
Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint. Zbl 0882.90069
Lee, Chung-Yee
51
1997
Scheduling with agreeable release times and due dates on a batch processing machine. Zbl 0929.90038
Li, Chung-Lun; Lee, Chung-Yee
29
1997
Job shop scheduling with a genetic algorithm and machine learning. Zbl 0953.90524
Lee, C.-Y.; Piramuthu, S.; Tsai, Y.-K.
15
1997
Workforce planning in mixed model assembly systems. Zbl 0887.90081
Lee, Chung-Yee; Vairaktarakis, George L.
11
1997
Machine scheduling with an availability constraint. Zbl 0870.90071
Lee, Chung-Yee
128
1996
Strategic investment analysis using activity based costing concepts and analytical hiearchy process techniques. Zbl 0947.90545
Angelis, D. I.; Lee, C.-Y.
3
1996
On the fixed interval due-date scheduling problem. Zbl 0846.90051
Lee, Chung-Yee; Li, Chung-Lun
2
1996
A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights. Zbl 0838.90066
Lee, C. Y.; Choi, J. Y.
20
1995
Solving a class scheduling problem with a genetic algorithm. Zbl 0843.90057
Herrmann, Jeffrey W.; Lee, Chung-Yee
6
1995
Minimizing the error bound for the dynamic lot size model. Zbl 0836.90066
Chen, Hsin-Der; Hearn, Donald W.; Lee, Chung-Yee
2
1995
Minimizing makespan in hybrid flowshops. Zbl 0812.90066
Lee, Chung-Yee; Vairaktarakis, George L.
55
1994
A posteriori error estimation of \(h-p\) finite element approximations of frictional contact problems. Zbl 0847.73062
Lee, C. Y.; Oden, J. T.
20
1994
A new dynamic programming algorithm for the single item capacitated dynamic lot size model. Zbl 0812.90037
Chen, Hsin-Der; Hearn, Donald W.; Lee, Chung-Yee
20
1994
Due window scheduling for parallel machines. Zbl 0810.90073
Krämer, F.-J.; Lee, C.-Y.
14
1994
A dynamic programming algorithm for dynamic lot size models with piecewise linear costs. Zbl 0812.90038
Chen, Hsin-Der; Hearn, Donald W.; Lee, Chung-Yee
11
1994
Cross-training effectiveness and profitability. Zbl 0899.90094
Ebeling, A. C.; Lee, C.-Y.
5
1994
Implementation of a demand-pull system in a job shop environment. Zbl 0896.90124
Lee, C.-Y.; Lin, C.-S.; Uzsoy, R.; Wong, C.-C.
1
1994
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Zbl 0783.90054
Lee, Chung-Yee; Cheng, T. C. E.; Lin, B. M. T.
58
1993
Minimizing total completion time on a batch processing machine with job families. Zbl 0771.90054
Chandru, Vijaya; Lee, Chung-Yee; Uzsoy, Reha
53
1993
Local a posteriori error estimators for variational inequalities. Zbl 0768.65032
Ainsworth, Mark; Oden, J. Tinsley; Lee, C. Y.
30
1993
Capacitated two-parallel machines scheduling to minimize sum of job completion times. Zbl 0778.90028
Lee, Chung-Yee; Liman, Surya Danusaputro
30
1993
On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date. Zbl 0842.90060
Herrmann, Jeffrey W.; Lee, Chung-Yee
30
1993
Complexity of single machine hierarchical scheduling: A survey. Zbl 0968.90521
Lee, Chung-Yee; Vairaktarakis, George L.
24
1993
A priori error estimation of \(hp\)-finite element approximations of frictional contact problems with normal compliance. Zbl 0772.73078
Lee, C. Y.; Oden, J. Tinsley
13
1993
Theory and approximation of quasistatic frictional contact problems. Zbl 0783.73083
Lee, C. Y.; Oden, J. T.
13
1993
Error bound of a heuristic for the common due date scheduling problem. Zbl 0789.90043
Liman, Surya Danusaputro; Lee, Chung-Yee
4
1993
A classification of static scheduling problems. Zbl 0968.90513
Herrmann, Jeffrey W.; Lee, Chung-Yee; Snowdon, Jane L.
3
1993
Efficient algorithms for scheduling semiconductor burn-in operations. Zbl 0759.90046
Lee, Chung-Yee; Uzsoy, Reha; Martin-Vega, Louis A.
166
1992
Single machine flow-time scheduling with scheduled maintenance. Zbl 0738.68043
Lee, Chung-Yee; Liman, Surya Danusaputro
64
1992
A new dynamic programming algorithm for the parallel machines total weighted completion time problem. Zbl 0760.90057
Lee, Chung-Yee; Uzsoy, Reha
17
1992
Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine. Zbl 0745.90042
Uzsoy, Reha; Lee, Chung-Yee; Martin-Vega, Louis A.
15
1992
Parallel machines scheduling with nonsimultaneous machine available time. Zbl 0722.90032
Lee, Chung-Yee
60
1991
Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date. Zbl 0717.90037
Lee, Chung-Yee; Danusaputro, Surya Liman; Lin, Chen-Sin
28
1991
Error bound for the dynamic lot size model with backlogging. Zbl 0717.90023
Denardo, Eric V.; Lee, Chung-Yee
3
1991
The dynamic lot size model with quantity discount. Zbl 0727.90020
Federgruen, Awi; Lee, Chung-Yee
23
1990
Scheduling precedence graphs in systems with interprocessor communication times. Zbl 0677.68026
Hwang, Jing-Jang; Chow, Yuan-Chieh; Anger, Frank D.; Lee, Chung-Yee
31
1989
Multiprocessor scheduling: Combining LPT and MULTIFIT. Zbl 0655.90036
Lee, Chung-Yee; Massey, J. David
22
1988
...and 7 more Documents
all top 5

Cited by 2,052 Authors

57 Yuan, Jinjiang
53 Cheng, Tai-Chiu Edwin
39 Lee, Chung-Yee
24 Ng, C. T. Daniel
21 Lu, Xiwen
18 Lu, Lingfa
18 Strusevich, Vitaly A.
17 Li, Shisheng
15 Chu, Chengbin
15 Leung, Joseph Y.-T.
14 Fu, Ruyan
14 He, Yong
14 Mosheiov, Gur
13 Lin, Guohui
12 Allahverdi, Ali
12 Dong, Jianming
12 Hu, Jueliang
12 Tian, Ji
11 Dauzère-Pérès, Stéphane
11 Hwang, Hark-Chin
11 Kacem, Imed
11 Li, Kai
10 Kellerer, Johann
10 Ou, Jinwen
10 Tang, Lixin
10 Zhang, Liqi
9 Çetinkaya, Sıla
9 Hadda, Hatem
9 Koulamas, Christos P.
9 Potts, Chris N.
9 Shabtay, Dvir
9 Uzsoy, Reha
9 Zhang, An
8 Chen, Yong
8 Chen, Zhi-Long
8 Han, Xin
8 Huo, Yumei
8 Jia, Zhaohong
8 Jiang, Yiwei
8 Jolai, Fariborz
8 Kovalëv, Mikhail Yakovlevich
8 Kyparisis, George J.
8 Lan, Yan
8 Li, Wenjie
8 Liu, Peihai
8 Pardalos, Panos M.
8 Tan, Zhiyi
8 Yang, Shanlin
8 Yin, Yunqiang
8 Zhang, Yuzhong
8 Zhao, Chuanli
8 Zhao, Hairong
7 Akturk, M. Selim
7 Billaut, Jean-Charles
7 Feng, Qi
7 Framinan, Jose M.
7 Gong, Hua
7 Ji, Min
7 Lee, Kangbok
7 Li, Shuguang
7 Liu, Zhaohui
7 Oğuz, Ceyda
7 Pinedo, Michael L.
7 Qi, Xiangtong
7 Tong, Weitian
7 Wang, Guoqing
7 Zhong, Weiya
6 Al-Anzi, Fawaz S.
6 Cai, Xiaoqiang
6 Fan, Baoqiang
6 Fowler, John W.
6 Jansen, Klaus
6 Jaruphongsa, Wikrom
6 Penz, Bernard
6 Pesch, Erwin
6 Rapine, Christophe
6 Ruiz-Torres, Alex J.
6 Tang, Hengyong
6 Trystram, Denis R.
6 Vairaktarakis, George L.
6 Wang, Jibo
5 Absi, Nabil
5 Agnetis, Alessandro
5 Benmansour, Rachid
5 Brahimi, Nadjib
5 Breit, Joachim
5 Cheng, Bayi
5 Dolgui, Alexandre B.
5 Dridi, Najoua
5 Fan, Jing
5 Fatemi Ghomi, Seyyed Mohammad Taghi
5 Gao, Yuan
5 Goebel, Randy G.
5 Gupta, Jatinder N. D.
5 Haouari, Mohamed
5 Ji, Ping
5 Li, Chung-Lun
5 Li, Guojun
5 Liao, Ching-Jong
5 Lin, Bertrand Miao-Tsong
...and 1,952 more Authors
all top 5

Cited in 101 Serials

296 European Journal of Operational Research
174 Computers & Operations Research
68 Journal of Scheduling
51 Journal of Combinatorial Optimization
49 Theoretical Computer Science
49 International Journal of Production Research
43 Annals of Operations Research
39 Operations Research Letters
35 Discrete Applied Mathematics
34 Applied Mathematical Modelling
28 Optimization Letters
25 Naval Research Logistics
25 Mathematical Problems in Engineering
24 Asia-Pacific Journal of Operational Research
22 Information Processing Letters
18 Journal of Industrial and Management Optimization
17 Operations Research
14 Discrete Dynamics in Nature and Society
14 RAIRO. Operations Research
14 Journal of the Operations Research Society of China
13 International Transactions in Operational Research
12 Journal of Global Optimization
12 INFORMS Journal on Computing
12 4OR
9 International Journal of Systems Science
9 Information Sciences
9 Journal of Information & Optimization Sciences
8 Applied Mathematics and Computation
8 Applied Mathematics. Series B (English Edition)
8 Engineering Optimization
7 Computers & Mathematics with Applications
7 Mathematical and Computer Modelling
7 OR Spectrum
7 Discrete Optimization
6 Opsearch
6 CEJOR. Central European Journal of Operations Research
5 International Journal of Foundations of Computer Science
5 Journal of Systems Science and Complexity
5 International Journal of Systems Science. Principles and Applications of Systems and Integration
4 Algorithmica
4 Mathematical Programming. Series A. Series B
4 Soft Computing
4 Discrete Mathematics, Algorithms and Applications
4 Arabian Journal for Science and Engineering
4 INFOR: Information Systems and Operational Research
3 Journal of Computer and System Sciences
3 Journal of Parallel and Distributed Computing
3 Journal of Heuristics
3 Probability in the Engineering and Informational Sciences
3 Journal of Zhejiang University. Science A
3 Journal of Mathematical Modelling and Algorithms in Operations Research
2 Automatica
2 INFOR
2 Mathematics and Computers in Simulation
2 Computational Optimization and Applications
2 Computational and Applied Mathematics
2 Top
2 Complexity
2 Parallel Algorithms and Applications
2 Optimization Methods & Software
2 The ANZIAM Journal
2 JMMA. Journal of Mathematical Modelling and Algorithms
2 Journal of Applied Mathematics and Computing
2 International Journal of Flexible Manufacturing Systems
2 SN Operations Research Forum
1 Chaos, Solitons and Fractals
1 Computing
1 Journal of Computational and Applied Mathematics
1 Journal of Optimization Theory and Applications
1 Kybernetes
1 Nonlinear Analysis. Theory, Methods & Applications. Series A: Theory and Methods
1 Stochastic Analysis and Applications
1 Acta Mathematicae Applicatae Sinica. English Series
1 Optimization
1 International Journal of Parallel Programming
1 International Journal of Approximate Reasoning
1 Queueing Systems
1 Japan Journal of Industrial and Applied Mathematics
1 YUJOR. Yugoslav Journal of Operations Research
1 Automation and Remote Control
1 International Journal of Computer Mathematics
1 RAIRO. Informatique Théorique et Applications
1 Advances in Engineering Software
1 Revista Investigación Operacional
1 Constraints
1 Mathematical Methods of Operations Research
1 Journal of Shanghai University
1 International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems
1 Journal of Applied Mathematics
1 Stochastic Models
1 Journal of Intelligent and Fuzzy Systems
1 Networks and Spatial Economics
1 Oberwolfach Reports
1 Science in China. Series F
1 International Journal of Information Technology & Decision Making
1 Operational Research. An International Journal
1 Advances in Operations Research
1 Science China. Information Sciences
1 Symmetry
1 Diskretnyĭ Analiz i Issledovanie Operatsiĭ
...and 1 more Serials

Citations by Year