×

zbMATH — the first resource for mathematics

Fatemi Ghomi, Seyyed Mohammad Taghi

Compute Distance To:
Author ID: fatemi-ghomi.seyyed-mohammad-taghi Recent zbMATH articles by "Fatemi Ghomi, Seyyed Mohammad Taghi"
Published as: Fatemi Ghomi, S. M. T.; Fatemi Ghomi, Seyyed Mohammad Taghi; Ghomi, Fatemi S. M. T.; Ghomi, S. M. T. Fatemi; Ghomi, Seyyed Mohammad Taghi Fatemi
Documents Indexed: 57 Publications since 1999

Publications by Year

Citations contained in zbMATH Open

44 Publications have been cited 239 times in 196 Documents Cited by Year
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Zbl 1102.90029
Zandieh, M.; Fatemi Ghomi, S. M. T.; Moattar Husseini, S. M.
19
2006
Hybrid flowshop scheduling with machine and resource-dependent processing times. Zbl 1211.90077
Behnamian, J.; Fatemi Ghomi, S. M. T.
17
2011
Scheduling open shops with parallel machines to minimize total completion time. Zbl 1200.90083
Naderi, B.; Fatemi Ghomi, S. M. T.; Aminnayeri, M.; Zandieh, M.
12
2011
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Zbl 1125.90025
Torabi, S. A.; Fatemi Ghomi, S. M. T.; Karimi, B.
12
2006
An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages. Zbl 1155.90312
Mirzazadeh, A.; Seyyed Esfahani, M. M.; Fatemi Ghomi, S. M. T.
11
2009
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times. Zbl 1197.90195
Behnamian, J.; Fatemi Ghomi, S. M. T.; Zandieh, M.
10
2010
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates. Zbl 1427.90169
Ebrahimi, M.; Fatemi Ghomi, S. M. T.; Karimi, B.
9
2014
Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach. Zbl 1349.90295
Yaghin, R. Ghasemy; Torabi, S. A.; Ghomi, S. M. T. Fatemi
9
2012
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines. Zbl 1127.90029
Jenabi, M.; Ghomi, Fatemi S. M. T.; Torabi, S. A.; Karimi, B.
9
2007
Optimal control of service rates and arrivals in Jackson networks. Zbl 1011.90016
Azaron, Amir; Fatemi Ghomi, S. M. T.
9
2003
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain. Zbl 1232.90115
Kamali, Amir; Ghomi, S. M. T. Fatemi; Jolai, F.
7
2011
A contribution and new heuristics for open shop scheduling. Zbl 1171.90403
Naderi, B.; Fatemi Ghomi, S. M. T.; Aminnayeri, M.; Zandieh, M.
7
2010
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling. Zbl 1197.90321
Behnamian, J.; Zandieh, M.; Fatemi Ghomi, S. M. T.
6
2010
Scheduling job shop problems with sequence-dependent setup times. Zbl 1198.90198
Naderi, B.; Zandieh, M.; Fatemi Ghomi, S. M. T.
6
2009
A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over. Zbl 1090.90204
Karimi, B.; Fatemi Ghomi, S. M. T.; Wilson, John M.
6
2006
The finite horizon economic lot scheduling in flexible flow lines. Zbl 1122.90360
Torabi, S. A.; Fatemi Ghomi, S. M. T.; Karimi, B.
6
2005
Acceleration strategies of Benders decomposition for the security constraints power system expansion planning. Zbl 1332.90177
Jenabi, M.; Fatemi Ghomi, S. M. T.; Torabi, S. A.; Hosseinian, S. H.
5
2015
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine. Zbl 1293.90022
Behnamian, J.; Ghomi, S. M. T. Fatemi
5
2013
Two-machine flow shop total tardiness scheduling problem with deteriorating jobs. Zbl 1254.90066
Bank, Maedeh; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz; Behnamian, J.
5
2012
A note on minimizing makespan on a single batch processing machine with nonidentical job sizes. Zbl 1177.90166
Kashan, Ali Husseinzadeh; Karimi, Behrooz; Fatemi Ghomi, S. M. T.
5
2009
A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network. Zbl 0949.90012
Fatemi Ghomi, S. M. T.; Hashemin, S. S.
5
1999
Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions. Zbl 1400.90008
Maihami, Reza; Karimi, Behrooz; Fatemi Ghomi, Seyyed Mohammad Taghi
4
2017
Prepositioning emergency earthquake response supplies: a new multi-objective particle swarm optimization algorithm. Zbl 07160029
Mohammadi, R.; Ghomi, S. M. T. Fatemi; Jolai, F.
4
2016
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times. Zbl 1349.90355
Iranpoor, Mehdi; Ghomi, S. M. T. Fatemi; Zandieh, M.
4
2013
Bi-criteria assembly line balancing by considering flexible operation times. Zbl 1228.90034
Hamta, Nima; Ghomi, S. M. T. Fatemi; Jolai, F.; Bahalke, Unes
4
2011
Group shops scheduling with makespan criterion subject to random release dates and processing times. Zbl 1171.90389
Ahmadizar, Fardin; Ghazanfari, Mehdi; Fatemi Ghomi, Seyyed Mohammad Taghi
4
2010
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. Zbl 1103.90047
Rabbani, M.; Fatemi Ghomi, S. M. T.; Jolai, F.; Lahiji, N. S.
4
2007
A new structural mechanism for reducibility of stochastic PERT networks. Zbl 1012.90004
Fatemi Ghomi, S. M. T.; Rabbani, M.
4
2003
Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics. Zbl 1430.90300
Mosadegh, H.; Fatemi Ghomi, S. M. T.; Süer, G. A.
3
2020
Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs. Zbl 1307.90064
Navaei, Javad; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz; Mozdgir, Ashkan
3
2014
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times. Zbl 1236.90049
Behnamian, J.; Ghomi, S. M. T. Fatemi; Jolai, F.; Amirtaheri, O.
3
2012
Path critical index and activity critical index in PERT networks. Zbl 0998.90009
Ghomi, Fatemi S. M. T.; Teimouri, E.
3
2002
A heuristic method for resource constrained allocation in multi-project scheduling. Zbl 1005.90034
Fatemi Ghomi, S. M. T.; Ashjari, B.
3
2002
Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness. Zbl 1286.90062
Mahnam, Mehdi; Moslehi, Ghasem; Fatemi Ghomi, Seyyed Mohammad Taghi
2
2013
A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes. Zbl 1284.91294
Ghasemy Yaghin, R.; Fatemi Ghomi, S. M. T.; Torabi, S. A.
2
2013
Fuzzy development of mean and range control charts using statistical properties of different representative values. Zbl 1303.62113
Alizadeh, H. Moheb; Ghomi, S. M. T. Fatemi
2
2011
MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups. Zbl 1197.90221
Mohammadi, M.; Fatemi Ghomi, S. M. T.; Karimi, B.; Torabi, S. A.
2
2010
Extension of common cycle lot-size scheduling for multi-product, multi-stage arborescent flow-shop environment. Zbl 1005.90027
Fatemi Ghomi, S. M. T.; Torabi, S. A.
2
2002
A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem. Zbl 1321.90026
Sarakhsi, M. Khojaste; Fatemi Ghomi, S. M. T.; Karimi, B.
1
2016
A game-theoretic model to analyze value creation with simultaneous cooperation and competition of supply chain partners. Zbl 1407.90057
Kafi, F.; Fatemi Ghomi, S. M. T.
1
2014
Fuzzy hypothesis testing with vague data using likelihood ratio test. Zbl 1329.62157
Alizadeh, H. Moheb; Khamseh, A. R. Arshadi; Ghomi, S. M. T. Fatemi
1
2013
A study on open shop scheduling to minimise total tardiness. Zbl 1356.90059
Naderi, B.; Ghomi, S. M. T. Fatemi; Aminnayeri, M.; Zandieh, M.
1
2011
Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost. Zbl 1207.90010
Narenji, M.; Fatemi Ghomi, S. M. T.; Nooraie, S. V. R.
1
2011
Lower bound for the mean project completion time in dynamic PERT networks. Zbl 1138.90352
Azaron, Amir; Fatemi Ghomi, S. M. T.
1
2008
Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics. Zbl 1430.90300
Mosadegh, H.; Fatemi Ghomi, S. M. T.; Süer, G. A.
3
2020
Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions. Zbl 1400.90008
Maihami, Reza; Karimi, Behrooz; Fatemi Ghomi, Seyyed Mohammad Taghi
4
2017
Prepositioning emergency earthquake response supplies: a new multi-objective particle swarm optimization algorithm. Zbl 07160029
Mohammadi, R.; Ghomi, S. M. T. Fatemi; Jolai, F.
4
2016
A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem. Zbl 1321.90026
Sarakhsi, M. Khojaste; Fatemi Ghomi, S. M. T.; Karimi, B.
1
2016
Acceleration strategies of Benders decomposition for the security constraints power system expansion planning. Zbl 1332.90177
Jenabi, M.; Fatemi Ghomi, S. M. T.; Torabi, S. A.; Hosseinian, S. H.
5
2015
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates. Zbl 1427.90169
Ebrahimi, M.; Fatemi Ghomi, S. M. T.; Karimi, B.
9
2014
Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs. Zbl 1307.90064
Navaei, Javad; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz; Mozdgir, Ashkan
3
2014
A game-theoretic model to analyze value creation with simultaneous cooperation and competition of supply chain partners. Zbl 1407.90057
Kafi, F.; Fatemi Ghomi, S. M. T.
1
2014
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine. Zbl 1293.90022
Behnamian, J.; Ghomi, S. M. T. Fatemi
5
2013
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times. Zbl 1349.90355
Iranpoor, Mehdi; Ghomi, S. M. T. Fatemi; Zandieh, M.
4
2013
Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness. Zbl 1286.90062
Mahnam, Mehdi; Moslehi, Ghasem; Fatemi Ghomi, Seyyed Mohammad Taghi
2
2013
A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes. Zbl 1284.91294
Ghasemy Yaghin, R.; Fatemi Ghomi, S. M. T.; Torabi, S. A.
2
2013
Fuzzy hypothesis testing with vague data using likelihood ratio test. Zbl 1329.62157
Alizadeh, H. Moheb; Khamseh, A. R. Arshadi; Ghomi, S. M. T. Fatemi
1
2013
Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach. Zbl 1349.90295
Yaghin, R. Ghasemy; Torabi, S. A.; Ghomi, S. M. T. Fatemi
9
2012
Two-machine flow shop total tardiness scheduling problem with deteriorating jobs. Zbl 1254.90066
Bank, Maedeh; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz; Behnamian, J.
5
2012
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times. Zbl 1236.90049
Behnamian, J.; Ghomi, S. M. T. Fatemi; Jolai, F.; Amirtaheri, O.
3
2012
Hybrid flowshop scheduling with machine and resource-dependent processing times. Zbl 1211.90077
Behnamian, J.; Fatemi Ghomi, S. M. T.
17
2011
Scheduling open shops with parallel machines to minimize total completion time. Zbl 1200.90083
Naderi, B.; Fatemi Ghomi, S. M. T.; Aminnayeri, M.; Zandieh, M.
12
2011
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain. Zbl 1232.90115
Kamali, Amir; Ghomi, S. M. T. Fatemi; Jolai, F.
7
2011
Bi-criteria assembly line balancing by considering flexible operation times. Zbl 1228.90034
Hamta, Nima; Ghomi, S. M. T. Fatemi; Jolai, F.; Bahalke, Unes
4
2011
Fuzzy development of mean and range control charts using statistical properties of different representative values. Zbl 1303.62113
Alizadeh, H. Moheb; Ghomi, S. M. T. Fatemi
2
2011
A study on open shop scheduling to minimise total tardiness. Zbl 1356.90059
Naderi, B.; Ghomi, S. M. T. Fatemi; Aminnayeri, M.; Zandieh, M.
1
2011
Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost. Zbl 1207.90010
Narenji, M.; Fatemi Ghomi, S. M. T.; Nooraie, S. V. R.
1
2011
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times. Zbl 1197.90195
Behnamian, J.; Fatemi Ghomi, S. M. T.; Zandieh, M.
10
2010
A contribution and new heuristics for open shop scheduling. Zbl 1171.90403
Naderi, B.; Fatemi Ghomi, S. M. T.; Aminnayeri, M.; Zandieh, M.
7
2010
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling. Zbl 1197.90321
Behnamian, J.; Zandieh, M.; Fatemi Ghomi, S. M. T.
6
2010
Group shops scheduling with makespan criterion subject to random release dates and processing times. Zbl 1171.90389
Ahmadizar, Fardin; Ghazanfari, Mehdi; Fatemi Ghomi, Seyyed Mohammad Taghi
4
2010
MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups. Zbl 1197.90221
Mohammadi, M.; Fatemi Ghomi, S. M. T.; Karimi, B.; Torabi, S. A.
2
2010
An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages. Zbl 1155.90312
Mirzazadeh, A.; Seyyed Esfahani, M. M.; Fatemi Ghomi, S. M. T.
11
2009
Scheduling job shop problems with sequence-dependent setup times. Zbl 1198.90198
Naderi, B.; Zandieh, M.; Fatemi Ghomi, S. M. T.
6
2009
A note on minimizing makespan on a single batch processing machine with nonidentical job sizes. Zbl 1177.90166
Kashan, Ali Husseinzadeh; Karimi, Behrooz; Fatemi Ghomi, S. M. T.
5
2009
Lower bound for the mean project completion time in dynamic PERT networks. Zbl 1138.90352
Azaron, Amir; Fatemi Ghomi, S. M. T.
1
2008
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines. Zbl 1127.90029
Jenabi, M.; Ghomi, Fatemi S. M. T.; Torabi, S. A.; Karimi, B.
9
2007
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. Zbl 1103.90047
Rabbani, M.; Fatemi Ghomi, S. M. T.; Jolai, F.; Lahiji, N. S.
4
2007
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Zbl 1102.90029
Zandieh, M.; Fatemi Ghomi, S. M. T.; Moattar Husseini, S. M.
19
2006
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Zbl 1125.90025
Torabi, S. A.; Fatemi Ghomi, S. M. T.; Karimi, B.
12
2006
A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over. Zbl 1090.90204
Karimi, B.; Fatemi Ghomi, S. M. T.; Wilson, John M.
6
2006
The finite horizon economic lot scheduling in flexible flow lines. Zbl 1122.90360
Torabi, S. A.; Fatemi Ghomi, S. M. T.; Karimi, B.
6
2005
Optimal control of service rates and arrivals in Jackson networks. Zbl 1011.90016
Azaron, Amir; Fatemi Ghomi, S. M. T.
9
2003
A new structural mechanism for reducibility of stochastic PERT networks. Zbl 1012.90004
Fatemi Ghomi, S. M. T.; Rabbani, M.
4
2003
Path critical index and activity critical index in PERT networks. Zbl 0998.90009
Ghomi, Fatemi S. M. T.; Teimouri, E.
3
2002
A heuristic method for resource constrained allocation in multi-project scheduling. Zbl 1005.90034
Fatemi Ghomi, S. M. T.; Ashjari, B.
3
2002
Extension of common cycle lot-size scheduling for multi-product, multi-stage arborescent flow-shop environment. Zbl 1005.90027
Fatemi Ghomi, S. M. T.; Torabi, S. A.
2
2002
A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network. Zbl 0949.90012
Fatemi Ghomi, S. M. T.; Hashemin, S. S.
5
1999
all top 5

Cited by 457 Authors

12 Fatemi Ghomi, Seyyed Mohammad Taghi
10 Azaron, Amir
7 Zandieh, Mostafa
5 Karimi, Behrooz
5 Mirzazadeh, Abolfazl
5 Naderi, Bahman
5 Sakawa, Masatoshi
5 Tavakkoli-Moghaddam, Reza
4 Allahverdi, Ali
4 Behnamian, J.
4 Framinan, Jose M.
4 Jafarian, Ahmad
4 Jolai, Fariborz
4 Katagiri, Hideki
4 Pan, Quanke
4 Ruiz, Rubén
4 Torabi, Seyed Ali
3 Buscher, Udo
3 Ghoreishi, Maryam
3 Kato, Kosuke
3 Nourbakhsh, Vahid
3 Weber, Gerhard-Wilhelm
3 Yang, Shanlin
2 Akartunalı, Kerem
2 Aminnayeri, Majid
2 Aydilek, Asiye
2 Aydilek, Harun
2 Chang, Koan-Yuh
2 Chen, Ruey-Maw
2 Cheng, Bayi
2 Cheng, Tai-Chiu Edwin
2 Chu, Weng-Ming
2 Davoudpour, Hamid
2 Devika, K.
2 Ebrahimi, Masoud
2 Fernandez-Viagas, Victor
2 Gao, Liang
2 Ghasemy Yaghin, R.
2 Govindan, Kannan
2 Guerriero, Francesca
2 Gupta, Jatinder N. D.
2 Kuhn, Heinrich
2 Lee, Wenchiung
2 Maihami, Reza
2 M’Hallah, Rym
2 Najafi, Amir Abbas
2 Nasini, Stefano
2 Noori, Siamak
2 Pereira, Jordi
2 Quadt, Daniel
2 Rabbani, Masoud
2 Rafiei, Hamed
2 Roshanaei, Vahid
2 Shen, Liji
2 Shi, Leyuan
2 Taleizadeh, Ata Allah
2 Wang, Ling
2 Wu, Tao
2 Yaghoubi, Saeed
2 Zia, Nadia Pourmohammad
1 Abbas, Moncef
1 Abdelmaguid, Tamer F.
1 Abedinnia, Hamid
1 Abreu, Levi R.
1 Absi, Nabil
1 Ahmadi, Ehsan
1 Ahmadi, Hadi
1 Ahmadizar, Fardin
1 Aitken, James
1 Akhavan Niaki, Seyed Taghi
1 Akrami, B.
1 Aktaş, Emel
1 Al-Salem, Mohammed
1 Aleman, Dionne M.
1 Alemany, M. M. E.
1 Alfaro-Fernández, Pedro
1 Alhajraf, Ali
1 Alizadeh, Mojtaba
1 Álvarez-Miranda, Eduardo
1 Amini-Dehak, Mohammad
1 Arjmand, Masoud
1 Awwad, Mohamed A.
1 Azadeh, Ali
1 Babazadeh, Reza
1 Babou, Nadia
1 Bahreininejad, Ardeshir
1 Bai, Danyu
1 Bakker, Monique
1 Bandyopadhyay, Susmita
1 Bang, June-Young
1 Barbosa, Valmir Carneiro
1 Barzinpour, Farnaz
1 Bedoya-Valencia, Leonardo
1 Beheshti Asl, N.
1 Bekrar, Abdelghani
1 Belkaid, Fayçal
1 Benmansour, Rachid
1 Beraldi, Patrizia
1 Beşikci, Umut
1 Bhattacharya, Arijit
...and 357 more Authors
all top 5

Cited in 45 Serials

35 Computers & Operations Research
34 European Journal of Operational Research
29 Applied Mathematical Modelling
12 Applied Mathematics and Computation
8 Annals of Operations Research
6 International Journal of Systems Science
6 Mathematical Problems in Engineering
5 International Journal of Production Research
5 Journal of Industrial and Management Optimization
5 International Journal of Systems Science. Principles and Applications of Systems and Integration
4 Optimization Letters
3 Information Sciences
3 Opsearch
3 RAIRO. Operations Research
3 Journal of Applied Mathematics
2 Computers & Mathematics with Applications
2 Asia-Pacific Journal of Operational Research
2 Soft Computing
2 Journal of Combinatorial Optimization
2 4OR
1 Computing
1 Fuzzy Sets and Systems
1 Mathematics and Computers in Simulation
1 Naval Research Logistics
1 Theoretical Computer Science
1 Optimization
1 International Journal of Information and Management Sciences
1 Discrete Event Dynamic Systems
1 Automation and Remote Control
1 Archives of Control Sciences
1 Computational Optimization and Applications
1 Top
1 Complexity
1 International Transactions in Operational Research
1 Abstract and Applied Analysis
1 Journal of Scheduling
1 CEJOR. Central European Journal of Operations Research
1 Brazilian Journal of Probability and Statistics
1 Journal of Systems Science and Complexity
1 Sādhanā
1 OR Spectrum
1 Networks and Spatial Economics
1 Iranian Journal of Fuzzy Systems
1 Algorithms
1 International Journal of Applied and Computational Mathematics

Citations by Year