×

zbMATH — the first resource for mathematics

Allahverdi, Ali

Compute Distance To:
Author ID: allahverdi.ali Recent zbMATH articles by "Allahverdi, Ali"
Published as: Allahverdi, Ali; Allahverdi, A.
Documents Indexed: 61 Publications since 1994

Publications by Year

Citations contained in zbMATH Open

55 Publications have been cited 693 times in 405 Documents Cited by Year
A survey of scheduling problems with setup times or costs. Zbl 1137.90474
Allahverdi, Ali; Ng, C. T.; Cheng, T. C. E.; Kovalyov, Mikhail Y.
208
2008
The third comprehensive survey on scheduling problems with setup times/costs. Zbl 1347.90031
Allahverdi, Ali
47
2015
The significance of reducing setup times/setup costs. Zbl 1137.90475
Allahverdi, Ali; Soroush, H. M.
29
2008
New heuristics for no-wait flowshops to minimize makespan. Zbl 1047.90053
Aldowaisan, Tariq; Allahverdi, Ali
26
2003
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Zbl 1079.90045
Allahverdi, Ali; Al-Anzi, Fawaz S.
21
2006
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. Zbl 1128.90024
Al-Anzi, Fawaz S.; Allahverdi, Ali
21
2007
Two-stage production scheduling with separated set-up times and stochastic breakdowns. Zbl 0832.90048
Allahverdi, Ali
17
1995
A survey of scheduling problems with no-wait in process. Zbl 1394.90002
Allahverdi, Ali
16
2016
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times. Zbl 0944.90021
Allahverdi, Ali
15
2000
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications. Zbl 0995.90026
Allahverdi, Ali; Al-Anzi, Fawaz S.
15
2002
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Zbl 0863.90080
Allahverdi, Ali
14
1996
Total flowtime in no-wait flowshops with separated setup times. Zbl 1040.90523
Aldowaisan, Tariq; Allahverdi, Ali
14
1998
No-wait flowshops with bicriteria of makespan and total completion time. Zbl 1139.90360
Allahverdi, A.; Aldowaisan, T.
13
2002
No-wait flowshops with bicriteria of makespan and maximum lateness. Zbl 1044.90040
Allahverdi, Ali; Aldowaisan, Tariq
13
2004
Two-machine flowshop minimum-length scheduling problem with random and bounded processing times. Zbl 1027.90026
Allahverdi, Ali; Sotskov, Yuri
13
2003
Flowshop scheduling problem to minimize total completion time with random and bounded processing times. Zbl 1095.90049
Sotskov, Y. N.; Allahverdi, A.; Lai, T.-C.
12
2004
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function. Zbl 0927.90044
Allahverdi, Ali; Mittenthal, John
12
1995
Two-machine ordered flowshop scheduling under random breakdowns. Zbl 0810.90060
Allahverdi, A.; Mittenthal, J.
11
1994
Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times. Zbl 1041.90020
Allahverdi, Ali; Aldowaisan, Tariq; Sotskov, Yuri N.
11
2003
The two-stage assembly scheduling problem to minimize total completion time with setup times. Zbl 1160.90467
Allahverdi, Ali; Al-Anzi, Fawaz S.
11
2009
A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness. Zbl 1087.90025
Allahverdi, Ali
10
2004
A hybrid tabu search heuristic for the two-stage assembly scheduling problem. Zbl 1136.90346
Al-Anzi, Fawaz S.; Allahverdi, Ali
10
2006
Scheduling in stochastic flowshops with independent setup, processing and removal times. Zbl 0893.90084
Allahverdi, Ali
10
1997
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. Zbl 1114.90373
Allahverdi, Ali; Al-Anzi, Fawaz S.
10
2006
Scheduling on \(M\) parallel machines subject to random breakdowns to minimize expected mean flow time. Zbl 0819.90041
Allahverdi, Ali; Mittenthal, John
9
1994
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times. Zbl 1131.90346
Allahverdi, A.; Aldowaisan, T.
7
2001
Total completion time with makespan constraint in no-wait flowshops with setup times. Zbl 1338.90156
Allahverdi, Ali; Aydilek, Harun
7
2014
Job lateness in flowshops with setup and removal times separated. Zbl 1140.90386
Allahverdi, A.; Aldowaisan, T.
6
1998
Some effective heuristics for no-wait flowshops with setup times to minimize total completion time. Zbl 1145.90027
Ruiz, Rubén; Allahverdi, Ali
6
2007
The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime. Zbl 1037.90020
Allahverdi, Ali
6
2003
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times. Zbl 1197.90189
Allahverdi, Ali; Aydilek, Harun
5
2010
Permutation flow shops with exact time lags to minimise maximum lateness. Zbl 1198.90180
Fondrevelle, J.; Oulamara, A.; Portmann, M.-C.; Allahverdi, A.
5
2009
New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness. Zbl 1198.90207
Ruiz, Rubén; Allahverdi, Ali
5
2009
Scheduling multi-stage parallel-processor services to minimize average response time. Zbl 1121.90050
Allahverdi, A.; Al-Anzi, F. S.
5
2006
Using mixed graph coloring to minimize total completion time in job shop scheduling. Zbl 1114.90033
Al-Anzi, Fawaz S.; Sotskov, Yuri N.; Allahverdi, Ali; Andreev, George V.
5
2006
Single machine scheduling problem with interval processing times to minimize mean weighted completion time. Zbl 1348.90236
Allahverdi, Ali; Aydilek, Harun; Aydilek, Asiye
5
2014
Heuristics for no-wait flowshops with makespan subject to mean completion time. Zbl 1291.90089
Aydilek, Harun; Allahverdi, Ali
4
2012
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan. Zbl 1179.90117
Al-Anzi, Fawaz S.; Allahverdi, Ali
4
2009
Minimizing total tardiness in no-wait flowshops. Zbl 1360.90119
Aldowaisan, Tariq; Allahverdi, Ali
4
2012
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time. Zbl 1189.90071
Aydilek, Harun; Allahverdi, Ali
3
2010
Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness. Zbl 1160.90483
Ruiz, Rubén; Allahverdi, Ali
3
2009
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. Zbl 1079.90046
Allahverdi, Ali; Al-Anzi, Fawaz S.
3
2006
Stochastically minimizing total flowtime in flowshops with no waiting space. Zbl 0933.90024
Allahverdi, Ali
3
1999
Batching deteriorating items with applications in computer communication and reverse logistics. Zbl 1121.90048
Al-Anzi, Fawaz S.; Allahverdi, Ali; Kovalyov, Mikhail Y.
3
2007
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times. Zbl 1426.90114
Aydilek, Harun; Allahverdi, Ali
3
2013
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times. Zbl 1201.90070
Allahverdi, Ali; Aydilek, Harun
2
2010
The tricriteria two-machine flowshop scheduling problem. Zbl 0992.90033
Allahverdi, Ali
2
2001
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm. Zbl 1114.90372
Al-Anzi, F. S.; Allahverdi, A.
2
2006
Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness. Zbl 1413.90104
Allahverdi, Ali; Allahverdi, Muberra
1
2018
A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan and total flowtime. Zbl 1162.90470
Yeh, Wei-Chang; Allahverdi, Ali
1
2004
The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times. Zbl 1154.90477
Ng, C. T.; Allahverdi, Ali; Al-Anzi, Fawaz S.; Cheng, T. C. Edwin
1
2007
Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times. Zbl 1231.90171
Allahverdi, Ali
1
2007
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests. Zbl 1087.68633
Al-Anzi, Fawaz S.; Allahverdi, Ali
1
2005
A polynomial genetic based algorithm to minimize maximum lateness in a two-stage flowshop with setup times. Zbl 1115.90334
Allahverdi, Ali; Al-Anzi, Fawaz S.; Gupta, J. N. D.
1
2005
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan. Zbl 1388.90050
Allahverdi, Ali; Aydilek, Harun; Aydilek, Asiye
1
2018
Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness. Zbl 1413.90104
Allahverdi, Ali; Allahverdi, Muberra
1
2018
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan. Zbl 1388.90050
Allahverdi, Ali; Aydilek, Harun; Aydilek, Asiye
1
2018
A survey of scheduling problems with no-wait in process. Zbl 1394.90002
Allahverdi, Ali
16
2016
The third comprehensive survey on scheduling problems with setup times/costs. Zbl 1347.90031
Allahverdi, Ali
47
2015
Total completion time with makespan constraint in no-wait flowshops with setup times. Zbl 1338.90156
Allahverdi, Ali; Aydilek, Harun
7
2014
Single machine scheduling problem with interval processing times to minimize mean weighted completion time. Zbl 1348.90236
Allahverdi, Ali; Aydilek, Harun; Aydilek, Asiye
5
2014
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times. Zbl 1426.90114
Aydilek, Harun; Allahverdi, Ali
3
2013
Heuristics for no-wait flowshops with makespan subject to mean completion time. Zbl 1291.90089
Aydilek, Harun; Allahverdi, Ali
4
2012
Minimizing total tardiness in no-wait flowshops. Zbl 1360.90119
Aldowaisan, Tariq; Allahverdi, Ali
4
2012
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times. Zbl 1197.90189
Allahverdi, Ali; Aydilek, Harun
5
2010
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time. Zbl 1189.90071
Aydilek, Harun; Allahverdi, Ali
3
2010
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times. Zbl 1201.90070
Allahverdi, Ali; Aydilek, Harun
2
2010
The two-stage assembly scheduling problem to minimize total completion time with setup times. Zbl 1160.90467
Allahverdi, Ali; Al-Anzi, Fawaz S.
11
2009
Permutation flow shops with exact time lags to minimise maximum lateness. Zbl 1198.90180
Fondrevelle, J.; Oulamara, A.; Portmann, M.-C.; Allahverdi, A.
5
2009
New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness. Zbl 1198.90207
Ruiz, Rubén; Allahverdi, Ali
5
2009
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan. Zbl 1179.90117
Al-Anzi, Fawaz S.; Allahverdi, Ali
4
2009
Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness. Zbl 1160.90483
Ruiz, Rubén; Allahverdi, Ali
3
2009
A survey of scheduling problems with setup times or costs. Zbl 1137.90474
Allahverdi, Ali; Ng, C. T.; Cheng, T. C. E.; Kovalyov, Mikhail Y.
208
2008
The significance of reducing setup times/setup costs. Zbl 1137.90475
Allahverdi, Ali; Soroush, H. M.
29
2008
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. Zbl 1128.90024
Al-Anzi, Fawaz S.; Allahverdi, Ali
21
2007
Some effective heuristics for no-wait flowshops with setup times to minimize total completion time. Zbl 1145.90027
Ruiz, Rubén; Allahverdi, Ali
6
2007
Batching deteriorating items with applications in computer communication and reverse logistics. Zbl 1121.90048
Al-Anzi, Fawaz S.; Allahverdi, Ali; Kovalyov, Mikhail Y.
3
2007
The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times. Zbl 1154.90477
Ng, C. T.; Allahverdi, Ali; Al-Anzi, Fawaz S.; Cheng, T. C. Edwin
1
2007
Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times. Zbl 1231.90171
Allahverdi, Ali
1
2007
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Zbl 1079.90045
Allahverdi, Ali; Al-Anzi, Fawaz S.
21
2006
A hybrid tabu search heuristic for the two-stage assembly scheduling problem. Zbl 1136.90346
Al-Anzi, Fawaz S.; Allahverdi, Ali
10
2006
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. Zbl 1114.90373
Allahverdi, Ali; Al-Anzi, Fawaz S.
10
2006
Scheduling multi-stage parallel-processor services to minimize average response time. Zbl 1121.90050
Allahverdi, A.; Al-Anzi, F. S.
5
2006
Using mixed graph coloring to minimize total completion time in job shop scheduling. Zbl 1114.90033
Al-Anzi, Fawaz S.; Sotskov, Yuri N.; Allahverdi, Ali; Andreev, George V.
5
2006
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. Zbl 1079.90046
Allahverdi, Ali; Al-Anzi, Fawaz S.
3
2006
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm. Zbl 1114.90372
Al-Anzi, F. S.; Allahverdi, A.
2
2006
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests. Zbl 1087.68633
Al-Anzi, Fawaz S.; Allahverdi, Ali
1
2005
A polynomial genetic based algorithm to minimize maximum lateness in a two-stage flowshop with setup times. Zbl 1115.90334
Allahverdi, Ali; Al-Anzi, Fawaz S.; Gupta, J. N. D.
1
2005
No-wait flowshops with bicriteria of makespan and maximum lateness. Zbl 1044.90040
Allahverdi, Ali; Aldowaisan, Tariq
13
2004
Flowshop scheduling problem to minimize total completion time with random and bounded processing times. Zbl 1095.90049
Sotskov, Y. N.; Allahverdi, A.; Lai, T.-C.
12
2004
A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness. Zbl 1087.90025
Allahverdi, Ali
10
2004
A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan and total flowtime. Zbl 1162.90470
Yeh, Wei-Chang; Allahverdi, Ali
1
2004
New heuristics for no-wait flowshops to minimize makespan. Zbl 1047.90053
Aldowaisan, Tariq; Allahverdi, Ali
26
2003
Two-machine flowshop minimum-length scheduling problem with random and bounded processing times. Zbl 1027.90026
Allahverdi, Ali; Sotskov, Yuri
13
2003
Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times. Zbl 1041.90020
Allahverdi, Ali; Aldowaisan, Tariq; Sotskov, Yuri N.
11
2003
The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime. Zbl 1037.90020
Allahverdi, Ali
6
2003
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications. Zbl 0995.90026
Allahverdi, Ali; Al-Anzi, Fawaz S.
15
2002
No-wait flowshops with bicriteria of makespan and total completion time. Zbl 1139.90360
Allahverdi, A.; Aldowaisan, T.
13
2002
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times. Zbl 1131.90346
Allahverdi, A.; Aldowaisan, T.
7
2001
The tricriteria two-machine flowshop scheduling problem. Zbl 0992.90033
Allahverdi, Ali
2
2001
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times. Zbl 0944.90021
Allahverdi, Ali
15
2000
Stochastically minimizing total flowtime in flowshops with no waiting space. Zbl 0933.90024
Allahverdi, Ali
3
1999
Total flowtime in no-wait flowshops with separated setup times. Zbl 1040.90523
Aldowaisan, Tariq; Allahverdi, Ali
14
1998
Job lateness in flowshops with setup and removal times separated. Zbl 1140.90386
Allahverdi, A.; Aldowaisan, T.
6
1998
Scheduling in stochastic flowshops with independent setup, processing and removal times. Zbl 0893.90084
Allahverdi, Ali
10
1997
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Zbl 0863.90080
Allahverdi, Ali
14
1996
Two-stage production scheduling with separated set-up times and stochastic breakdowns. Zbl 0832.90048
Allahverdi, Ali
17
1995
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function. Zbl 0927.90044
Allahverdi, Ali; Mittenthal, John
12
1995
Two-machine ordered flowshop scheduling under random breakdowns. Zbl 0810.90060
Allahverdi, A.; Mittenthal, J.
11
1994
Scheduling on \(M\) parallel machines subject to random breakdowns to minimize expected mean flow time. Zbl 0819.90041
Allahverdi, Ali; Mittenthal, John
9
1994
all top 5

Cited by 727 Authors

40 Allahverdi, Ali
16 Ruiz, Rubén
11 Aydilek, Harun
10 Al-Anzi, Fawaz S.
10 Cheng, Tai-Chiu Edwin
10 Sotskov, Yuri N.
9 Mosheiov, Gur
7 Framinan, Jose M.
7 Koulamas, Christos P.
7 Kovalyov, Mikhail Yakovlevich
7 Pan, Quanke
6 Yang, Dar-Li
5 Aydilek, Asiye
5 Buscher, Udo
5 Choi, Byung-Cheon
5 Kalczynski, Pawel Jan
5 Kamburowski, Jerzy
5 Perez-Gonzalez, Paz
5 Shen, Liji
4 Aldowaisan, Tariq A.
4 Egorova, Natalja G.
4 Fatemi Ghomi, Seyyed Mohammad Taghi
4 Gupta, Jatinder N. D.
4 Kuo, Wen-Hung
4 Kyparisis, George J.
4 Leung, Joseph Y.-T.
4 Li, Shisheng
4 Li, Xiaoping
4 Liao, Ching-Jong
4 Lin, Shih-Wei
4 Oron, Daniel
4 Pinedo, Michael L.
4 Ying, Kuo-Ching
4 Zandieh, Mostafa
3 Bang, June-Young
3 Cai, Xiaoqiang
3 Chen, Renxia
3 Eren, Tamer
3 Fernandez-Viagas, Victor
3 Jolai, Fariborz
3 Kedad-Sidhoum, Safia
3 Lai, Tsung-Chyan
3 Lee, Zne-Jung
3 Liu, Xinbao
3 Matsveichuk, Natalja M.
3 Mor, Baruch
3 Panwalkar, Shrikant S.
3 Pardalos, Panos M.
3 Pastor, Rafael
3 Pei, Jun
3 Perea, Federico
3 Schryen, Guido
3 Serairi, Mehdi
3 Stützle, Thomas G.
3 Werner, Frank
3 Wirth, Andrew
3 Wu, Cheng
3 Xing, Keyi
3 Zhou, Xian
2 Ackermann, Heiner
2 Adamu, Muminu O.
2 Adewumi, Aderemi Oluyinka
2 Aloulou, Mohamed Ali
2 Alvarez, Ada M.
2 Angel-Bello, Francisco R.
2 Arroyo, José Elias Claudio
2 Aubry, Alexis
2 Bard, Jonathan F.
2 Barketau, Maksim S.
2 Behnamian, J.
2 Bendotti, Pascale
2 Bilgen, Bilge
2 Boysen, Nils
2 Chao, Chien-Wen
2 Chen, Yin-Yann
2 Chern, Maw-Sheng
2 Chu, Chengbin
2 Chu, Feng
2 Correa, José R.
2 Dauzère-Pérès, Stéphane
2 Detienne, Boris
2 Dhouib, Emna
2 Diessel, Erik
2 Dolgui, Alexandre B.
2 Emde, Simon
2 Espinouse, Marie-Laure
2 Fan, Wenjuan
2 Fanjul-Peyro, Luis
2 Fouilhoux, Pierre
2 Gagné, Caroline
2 Gerstl, Enrique
2 Gharbi, Anis
2 Güner, Ertan
2 Hazır, Öncü
2 Hou, Yung-Tsung
2 Hsu, Chou-Jung
2 Iori, Manuel
2 Jacomino, Mireille
2 Ji, Min
2 Kacem, Imed
...and 627 more Authors
all top 5

Cited in 74 Serials

98 European Journal of Operational Research
88 Computers & Operations Research
24 Journal of Scheduling
19 International Journal of Production Research
18 Applied Mathematical Modelling
9 Applied Mathematics and Computation
9 Asia-Pacific Journal of Operational Research
9 Annals of Operations Research
6 Computers & Mathematics with Applications
6 Mathematical and Computer Modelling
6 Mathematical Problems in Engineering
5 International Transactions in Operational Research
4 Information Processing Letters
4 Theoretical Computer Science
4 Journal of Combinatorial Optimization
4 Journal of Applied Mathematics
4 OR Spectrum
4 Journal of Industrial and Management Optimization
3 Automation and Remote Control
3 Discrete Dynamics in Nature and Society
3 Optimization Letters
3 International Journal of Systems Science. Principles and Applications of Systems and Integration
2 Discrete Applied Mathematics
2 International Journal of Systems Science
2 Information Sciences
2 Naval Research Logistics
2 Operations Research Letters
2 Foundations of Computing and Decision Sciences
2 Annals of Mathematics and Artificial Intelligence
2 Complexity
2 Mathematical Methods of Operations Research
2 Sādhanā
2 Algorithms
1 Artificial Intelligence
1 Discrete Mathematics
1 Fuzzy Sets and Systems
1 Journal of Computer and System Sciences
1 Mathematics and Computers in Simulation
1 Optimization
1 International Journal of Approximate Reasoning
1 SIAM Journal on Discrete Mathematics
1 Real-Time Systems
1 Journal of Global Optimization
1 YUJOR. Yugoslav Journal of Operations Research
1 International Journal of Computer Mathematics
1 Journal of Statistical Computation and Simulation
1 Mathematical Programming. Series A. Series B
1 Advances in Engineering Software
1 Cybernetics and Systems Analysis
1 Computational Optimization and Applications
1 Computational and Applied Mathematics
1 Journal of Heuristics
1 Optimization Methods & Software
1 CEJOR. Central European Journal of Operations Research
1 RAIRO. Operations Research
1 The ANZIAM Journal
1 Journal of Systems Science and Complexity
1 JMMA. Journal of Mathematical Modelling and Algorithms
1 Journal of Applied Mathematics and Computing
1 Journal of Intelligent and Fuzzy Systems
1 4OR
1 Fuzzy Optimization and Decision Making
1 International Journal of Flexible Manufacturing Systems
1 Discrete Optimization
1 Sibirskie Èlektronnye Matematicheskie Izvestiya
1 Science in China. Series F
1 Pesquisa Operacional
1 Advances in Operations Research
1 Diskretnyĭ Analiz i Issledovanie Operatsiĭ
1 Afrika Matematika
1 Arabian Journal for Science and Engineering
1 Numerical Algebra, Control and Optimization
1 EURO Journal on Computational Optimization
1 Journal of Mathematical Modelling and Algorithms in Operations Research

Citations by Year