×

zbMATH — the first resource for mathematics

Al-Anzi, Fawaz S.

Compute Distance To:
Author ID: al-anzi.fawaz-s Recent zbMATH articles by "Al-Anzi, Fawaz S."
Published as: Al-Anzi, F. S.; Al-Anzi, Fawaz S.
External Links: ORCID
Documents Indexed: 16 Publications since 2002

Publications by Year

Citations contained in zbMATH Open

15 Publications have been cited 113 times in 63 Documents Cited by Year
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. Zbl 1128.90024
Al-Anzi, Fawaz S.; Allahverdi, Ali
21
2007
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Zbl 1079.90045
Allahverdi, Ali; Al-Anzi, Fawaz S.
21
2006
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications. Zbl 0995.90026
Allahverdi, Ali; Al-Anzi, Fawaz S.
15
2002
The two-stage assembly scheduling problem to minimize total completion time with setup times. Zbl 1160.90467
Allahverdi, Ali; Al-Anzi, Fawaz S.
11
2009
A hybrid tabu search heuristic for the two-stage assembly scheduling problem. Zbl 1136.90346
Al-Anzi, Fawaz S.; Allahverdi, Ali
10
2006
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. Zbl 1114.90373
Allahverdi, Ali; Al-Anzi, Fawaz S.
10
2006
Using mixed graph coloring to minimize total completion time in job shop scheduling. Zbl 1114.90033
Al-Anzi, Fawaz S.; Sotskov, Yuri N.; Allahverdi, Ali; Andreev, George V.
5
2006
Scheduling multi-stage parallel-processor services to minimize average response time. Zbl 1121.90050
Allahverdi, A.; Al-Anzi, F. S.
5
2006
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan. Zbl 1179.90117
Al-Anzi, Fawaz S.; Allahverdi, Ali
4
2009
Batching deteriorating items with applications in computer communication and reverse logistics. Zbl 1121.90048
Al-Anzi, Fawaz S.; Allahverdi, Ali; Kovalyov, Mikhail Y.
3
2007
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. Zbl 1079.90046
Allahverdi, Ali; Al-Anzi, Fawaz S.
3
2006
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm. Zbl 1114.90372
Al-Anzi, F. S.; Allahverdi, A.
2
2006
The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times. Zbl 1154.90477
Ng, C. T.; Allahverdi, Ali; Al-Anzi, Fawaz S.; Cheng, T. C. Edwin
1
2007
A polynomial genetic based algorithm to minimize maximum lateness in a two-stage flowshop with setup times. Zbl 1115.90334
Allahverdi, Ali; Al-Anzi, Fawaz S.; Gupta, J. N. D.
1
2005
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests. Zbl 1087.68633
Al-Anzi, Fawaz S.; Allahverdi, Ali
1
2005
The two-stage assembly scheduling problem to minimize total completion time with setup times. Zbl 1160.90467
Allahverdi, Ali; Al-Anzi, Fawaz S.
11
2009
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan. Zbl 1179.90117
Al-Anzi, Fawaz S.; Allahverdi, Ali
4
2009
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. Zbl 1128.90024
Al-Anzi, Fawaz S.; Allahverdi, Ali
21
2007
Batching deteriorating items with applications in computer communication and reverse logistics. Zbl 1121.90048
Al-Anzi, Fawaz S.; Allahverdi, Ali; Kovalyov, Mikhail Y.
3
2007
The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times. Zbl 1154.90477
Ng, C. T.; Allahverdi, Ali; Al-Anzi, Fawaz S.; Cheng, T. C. Edwin
1
2007
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Zbl 1079.90045
Allahverdi, Ali; Al-Anzi, Fawaz S.
21
2006
A hybrid tabu search heuristic for the two-stage assembly scheduling problem. Zbl 1136.90346
Al-Anzi, Fawaz S.; Allahverdi, Ali
10
2006
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. Zbl 1114.90373
Allahverdi, Ali; Al-Anzi, Fawaz S.
10
2006
Using mixed graph coloring to minimize total completion time in job shop scheduling. Zbl 1114.90033
Al-Anzi, Fawaz S.; Sotskov, Yuri N.; Allahverdi, Ali; Andreev, George V.
5
2006
Scheduling multi-stage parallel-processor services to minimize average response time. Zbl 1121.90050
Allahverdi, A.; Al-Anzi, F. S.
5
2006
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. Zbl 1079.90046
Allahverdi, Ali; Al-Anzi, Fawaz S.
3
2006
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm. Zbl 1114.90372
Al-Anzi, F. S.; Allahverdi, A.
2
2006
A polynomial genetic based algorithm to minimize maximum lateness in a two-stage flowshop with setup times. Zbl 1115.90334
Allahverdi, Ali; Al-Anzi, Fawaz S.; Gupta, J. N. D.
1
2005
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests. Zbl 1087.68633
Al-Anzi, Fawaz S.; Allahverdi, Ali
1
2005
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications. Zbl 0995.90026
Allahverdi, Ali; Al-Anzi, Fawaz S.
15
2002
all top 5

Cited by 147 Authors

12 Allahverdi, Ali
8 Al-Anzi, Fawaz S.
4 Framinan, Jose M.
3 Jolai, Fariborz
3 Perez-Gonzalez, Paz
2 Fatemi Ghomi, Seyyed Mohammad Taghi
2 Fernandez-Viagas, Victor
2 Kovalyov, Mikhail Yakovlevich
2 Liao, Ching-Jong
2 Mladenović, Nenad
2 Tseng, Chao-Tang
2 Wang, Feng
2 Xing, Keyi
2 Xiong, Fuli
1 Aliev, Rafik Aziz
1 Aliev, Rashad R.
1 Altsitsiadis, Efthymios
1 Amaldass, Nareyus I. Lawrance
1 Andronikidis, Andreas
1 Anghinolfi, Davide
1 Aydilek, Asiye
1 Aydilek, Harun
1 Bai, Danyu
1 Bang, June-Young
1 Bank, Maedeh
1 Baptiste, Pierre
1 Behnamian, J.
1 Benavides, Alexander J.
1 Bürgy, Reinhard
1 Chen, Jianyu
1 Chen, Yin-Yann
1 Cheng, Tai-Chiu Edwin
1 Cocco Mariani, Viviana
1 Damaschke, Peter
1 Dhouib, Emna
1 Dong, Jianming
1 Dos Santos Coelho, Leandro
1 Eliiyi, Deniz Türsel
1 Fattahi, Pariviz
1 Fazlollahi, Bijan
1 Feng, Jun’e
1 Furmańczyk, Hanna
1 Gharbi, Anis
1 Gordon, Valery S.
1 Guirimov, B. G.
1 Han, Libin
1 Hejazi, Seyed Reza
1 Hertz, Alain
1 Hong, Jen-Shin
1 Hosseini, Seyed Mohammad Hassan
1 Hsieh, Yi-Chih
1 Hsu, Cheng-Yu
1 Hsu, Peng-Hsiang
1 Hu, Chunhua
1 Hu, Jueliang
1 Huang, Feng-Yi
1 Jiang, Yiwei
1 Jin, Qun
1 Jung, Sunwoong
1 Kiczko, Adam
1 Kim, Byung Soo
1 Kim, Hyun Jung
1 Koh, Shiegheun
1 Kosowski, Adrian
1 Koulamas, Christos P.
1 Kyparisis, George J.
1 Ladhari, Talel
1 Lee, Ik Sun
1 Lee, Ju Yong
1 Lee, Junho
1 Lee, Yueh-Min
1 Lei, Hang
1 Leisten, Rainer
1 Levin, Genadi M.
1 Li, Xiang
1 Liang, Wei
1 Lin, Bertrand Miao-Tsong
1 Lin, Feng-Cheng
1 Lin, Win-Chin
1 Liou, Cheng-Dar
1 Liu, Xinbao
1 Loukil, Taïcir
1 Lu, Shaojun
1 Lucas, Cormac A.
1 Luo, Hui
1 Meng, Min
1 Mozdgir, Ashkan
1 Msakni, Mohamed Kais
1 Mukhopadhyay, Samar K.
1 Napiorkowski, Jaroslaw J.
1 Navaei, Javad
1 Ng, Chi To
1 Öztop, Hande
1 Pahl, Julia
1 Pal, Madhumangal
1 Pan, Quanke
1 Paolucci, Massimo
1 Pardalos, Panos M.
1 Pei, Jun
1 Piotrowski, Adam P.
...and 47 more Authors

Citations by Year