Rajendran, Chandrasekharan; Chaudhuri, Dipak A multi-stage parallel-processor flowshop problem with minimum flowtime. (English) Zbl 0767.90040 Eur. J. Oper. Res. 57, No. 1, 111-122 (1992). MSC: 90B35 90-08 PDFBibTeX XMLCite \textit{C. Rajendran} and \textit{D. Chaudhuri}, Eur. J. Oper. Res. 57, No. 1, 111--122 (1992; Zbl 0767.90040) Full Text: DOI
Tokarev, V. V. Guaranteed contracting and functional compensation of disruptions in raw material deliveries. III: Acceptable and optimal plans. (English. Russian original) Zbl 0812.90060 Autom. Remote Control 53, No. 12, Pt. 2, 1891-1896 (1992); translation from Avtom. Telemekh. 1992, No. 12, 81-87 (1992). MSC: 90B30 90C90 PDFBibTeX XMLCite \textit{V. V. Tokarev}, Autom. Remote Control 53, No. 12, Part 2, 1 (1992; Zbl 0812.90060); translation from Avtom. Telemekh. 1992, No. 12, 81--87 (1992)
Aggarwal, Vijay; Deo, Narsingh; Sarkar, Dilip The knapsack problem with disjoint multiple-choice constraints. (English) Zbl 0764.90056 Nav. Res. Logist. 39, No. 2, 213-227 (1992). Reviewer: N.I.Yanev (Sofia) MSC: 90C09 90-08 90C60 PDFBibTeX XMLCite \textit{V. Aggarwal} et al., Nav. Res. Logist. 39, No. 2, 213--227 (1992; Zbl 0764.90056) Full Text: DOI