Rojanasoonthon, Siwate; Bard, Jonathan A GRASP for parallel machine scheduling with time windows. (English) Zbl 1239.90052 INFORMS J. Comput. 17, No. 1, 32-51 (2005). MSC: 90B35 68M20 PDFBibTeX XMLCite \textit{S. Rojanasoonthon} and \textit{J. Bard}, INFORMS J. Comput. 17, No. 1, 32--51 (2005; Zbl 1239.90052) Full Text: DOI Link
Lee, Wen-Chiung; Wu, Chin-Chia A single machine bicriterion scheduling problem with setup times. (English) Zbl 1146.90417 J. Stat. Manag. Syst. 8, No. 3, 559-568 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{W.-C. Lee} and \textit{C.-C. Wu}, J. Stat. Manag. Syst. 8, No. 3, 559--568 (2005; Zbl 1146.90417) Full Text: DOI
Crauwels, H. A. J.; Potts, C. N.; Van Oudheusden, D.; Van Wassenhove, L. N. Branch and bound algorithms for single machine scheduling with batching to minimize the number of late jobs. (English) Zbl 1154.90434 J. Sched. 8, No. 2, 161-177 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{H. A. J. Crauwels} et al., J. Sched. 8, No. 2, 161--177 (2005; Zbl 1154.90434) Full Text: DOI
Garrido, Angel Improving the classification of complexities. (English) Zbl 1119.68364 Acta Univ. Apulensis, Math. Inform. 10, 19-23 (2005). Reviewer: Jozef Vyskoc (Rovinka) MSC: 68Q15 PDFBibTeX XMLCite \textit{A. Garrido}, Acta Univ. Apulensis, Math. Inform. 10, 19--23 (2005; Zbl 1119.68364) Full Text: EuDML
Hagras, Tarek; Janeček, Jan A machine assignment mechanism for compile-time list-scheduling heuristics. (English) Zbl 1109.68035 Comput. Inform. 24, No. 4, 341-350 (2005). MSC: 68N20 68M20 68T20 PDFBibTeX XMLCite \textit{T. Hagras} and \textit{J. Janeček}, Comput. Inform. 24, No. 4, 341--350 (2005; Zbl 1109.68035)
Palesheva, E. V. Intrinsic curvature of a 3-dimensional space and energy costs which are necessary for a 4-dimensional molehole to appear. (Russian) Zbl 1104.83040 Mat. Strukt. Model. 15, 92-101 (2005). MSC: 83F05 53Z05 PDFBibTeX XMLCite \textit{E. V. Palesheva}, Mat. Strukt. Model. 15, 92--101 (2005; Zbl 1104.83040)
Wu, Chinchia; Lee, Wenchiung A single-machine group schedule with fuzzy setup and processing times. (English) Zbl 1098.90036 J. Inf. Optim. Sci. 26, No. 3, 683-691 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{C. Wu} and \textit{W. Lee}, J. Inf. Optim. Sci. 26, No. 3, 683--691 (2005; Zbl 1098.90036) Full Text: DOI
Butler, Darren E.; Bove, V. Michael jun.; Sridharan, Sridha Real-time adaptive foreground/background segmentation. (English) Zbl 1097.68644 EURASIP J. Appl. Signal Process. 2005, No. 14, 2292-2304 (2005). MSC: 68T45 68U10 PDFBibTeX XMLCite \textit{D. E. Butler} et al., EURASIP J. Appl. Signal Process. 2005, No. 14, 2292--2304 (2005; Zbl 1097.68644) Full Text: DOI
Hamada, Toshio A Bayesian sequential batch-size decision problem to minimize expected total completion time on a single machine. (English) Zbl 1139.90367 J. Oper. Res. Soc. Japan 48, No. 3, 256-268 (2005). MSC: 90C39 PDFBibTeX XMLCite \textit{T. Hamada}, J. Oper. Res. Soc. Japan 48, No. 3, 256--268 (2005; Zbl 1139.90367) Full Text: DOI
Klimovsky, A. Learning and generalization errors for the 2D binary perceptron. (English) Zbl 1121.82344 Math. Comput. Modelling 42, No. 11-12, 1339-1358 (2005). MSC: 82C32 62E20 62M45 PDFBibTeX XMLCite \textit{A. Klimovsky}, Math. Comput. Modelling 42, No. 11--12, 1339--1358 (2005; Zbl 1121.82344) Full Text: DOI
Mosheiov, G. A note on scheduling deteriorating jobs. (English) Zbl 1082.90038 Math. Comput. Modelling 41, No. 8-9, 883-886 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{G. Mosheiov}, Math. Comput. Modelling 41, No. 8--9, 883--886 (2005; Zbl 1082.90038) Full Text: DOI
Chaitanya, V. Sree Krishna Stability analysis of structurally unstable man–machine system involving time delays. (English) Zbl 1086.70004 Nonlinear Anal., Real World Appl. 6, No. 5, 845-857 (2005). MSC: 70E60 93D09 34K20 70K20 70Q05 PDFBibTeX XMLCite \textit{V. S. K. Chaitanya}, Nonlinear Anal., Real World Appl. 6, No. 5, 845--857 (2005; Zbl 1086.70004) Full Text: DOI
Chua, Leon O.; Sbitnev, Valery I.; Yoon, Sook A nonlinear dynamics perspective of Wolfram’s new kind of science. Part IV: From Bernoulli shift to \(1/f\) spectrum. (English) Zbl 1084.37011 Int. J. Bifurcation Chaos Appl. Sci. Eng. 15, No. 4, 1045-1183 (2005). MSC: 37B15 82C32 68Q80 PDFBibTeX XMLCite \textit{L. O. Chua} et al., Int. J. Bifurcation Chaos Appl. Sci. Eng. 15, No. 4, 1045--1183 (2005; Zbl 1084.37011) Full Text: DOI
Fan, Jing; Yang, Qifan Linear time algorithm for scheduling on three parallel machines with non-simultaneous machine available times. (Chinese. English summary) Zbl 1096.90016 J. Zhejiang Univ., Sci. Ed. 32, No. 3, 258-263 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{J. Fan} and \textit{Q. Yang}, J. Zhejiang Univ., Sci. Ed. 32, No. 3, 258--263 (2005; Zbl 1096.90016)
Kwon, Chulan; Kim, Hyong Kyun Anti-pairing in learning of a neural network with redundant hidden units. (English) Zbl 1092.82031 J. Phys. A, Math. Gen. 38, No. 25, 5627-5646 (2005). Reviewer: Claudia Simionescu-Badea (Wien) MSC: 82C32 65C05 PDFBibTeX XMLCite \textit{C. Kwon} and \textit{H. K. Kim}, J. Phys. A, Math. Gen. 38, No. 25, 5627--5646 (2005; Zbl 1092.82031) Full Text: DOI
Gupta, J. N. D.; Ruiz-Torres, Alex J. Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs. (English) Zbl 1078.90025 Eur. J. Oper. Res. 167, No. 3, 679-695 (2005). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{J. N. D. Gupta} and \textit{A. J. Ruiz-Torres}, Eur. J. Oper. Res. 167, No. 3, 679--695 (2005; Zbl 1078.90025) Full Text: DOI
Mosheiov, Gur; Oron, Daniel; Ritov, Yaacov Minimizing flow-time on a single machine with integer batch sizes. (English) Zbl 1195.90043 Oper. Res. Lett. 33, No. 5, 497-501 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{G. Mosheiov} et al., Oper. Res. Lett. 33, No. 5, 497--501 (2005; Zbl 1195.90043) Full Text: DOI
Poon, Chung Keung; Yu, Wenci On-line scheduling algorithms for a batch machine with finite capacity. (English) Zbl 1079.90060 J. Comb. Optim. 9, No. 2, 167-186 (2005). MSC: 90B35 68M20 PDFBibTeX XMLCite \textit{C. K. Poon} and \textit{W. Yu}, J. Comb. Optim. 9, No. 2, 167--186 (2005; Zbl 1079.90060) Full Text: DOI
Baptiste, Philippe; Le Pape, Claude Scheduling a single machine to minimize a regular objective function under setup constraints. (English) Zbl 1140.90390 Discrete Optim. 2, No. 1, 83-99 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{P. Baptiste} and \textit{C. Le Pape}, Discrete Optim. 2, No. 1, 83--99 (2005; Zbl 1140.90390) Full Text: DOI
Gharbi, Anis; Haouari, Mohamed Optimal parallel machines scheduling with availability constraints. (English) Zbl 1066.90028 Discrete Appl. Math. 148, No. 1, 63-87 (2005). MSC: 90B35 90C57 68M20 PDFBibTeX XMLCite \textit{A. Gharbi} and \textit{M. Haouari}, Discrete Appl. Math. 148, No. 1, 63--87 (2005; Zbl 1066.90028) Full Text: DOI
Ng, C. T.; Cheng, T. C. Edwin; Janiak, Adam; Kovalyov, Mikhail Y. Group scheduling with controllable setup and processing times: minimizing total weighted completion time. (English) Zbl 1119.90020 Ann. Oper. Res. 133, 163-174 (2005). MSC: 90B35 90C27 PDFBibTeX XMLCite \textit{C. T. Ng} et al., Ann. Oper. Res. 133, 163--174 (2005; Zbl 1119.90020) Full Text: DOI
Colin, Emerson C.; Quinino, Roberto C. An algorithm for insertion of idle time in the single-machine scheduling problem with convex cost functions. (English) Zbl 1116.90347 Comput. Oper. Res. 32, No. 9, 2285-2296 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{E. C. Colin} and \textit{R. C. Quinino}, Comput. Oper. Res. 32, No. 9, 2285--2296 (2005; Zbl 1116.90347) Full Text: DOI
Janiak, Adam; Kovalyov, Mikhail Y.; Kubiak, Wieslaw; Werner, Frank Positive half-products and scheduling with controllable processing times. (English) Zbl 1066.90031 Eur. J. Oper. Res. 165, No. 2, 416-422 (2005). MSC: 90B35 90C59 65Y20 PDFBibTeX XMLCite \textit{A. Janiak} et al., Eur. J. Oper. Res. 165, No. 2, 416--422 (2005; Zbl 1066.90031) Full Text: DOI
Sadfi, Cherif; Penz, Bernard; Rapine, Christophe; Błażewicz, Jacek; Formanowicz, Piotr An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints. (English) Zbl 1065.90041 Eur. J. Oper. Res. 161, No. 1, 3-10 (2005). MSC: 90B35 90C59 65Y20 PDFBibTeX XMLCite \textit{C. Sadfi} et al., Eur. J. Oper. Res. 161, No. 1, 3--10 (2005; Zbl 1065.90041) Full Text: DOI
Jeng, A. A. K.; Lin, B. M. T. Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs. (English) Zbl 1077.90025 Comput. Oper. Res. 32, No. 3, 521-536 (2005). MSC: 90B35 68M20 90C57 PDFBibTeX XMLCite \textit{A. A. K. Jeng} and \textit{B. M. T. Lin}, Comput. Oper. Res. 32, No. 3, 521--536 (2005; Zbl 1077.90025) Full Text: DOI