Hsieh, Chung-Chi; Lai, Hsing-Hua; Masruroh, Nur Aini Production decision making considering dual material types and setup time uncertainty. (English) Zbl 1481.90155 Appl. Math. Modelling 96, 751-765 (2021). MSC: 90B30 90B05 PDF BibTeX XML Cite \textit{C.-C. Hsieh} et al., Appl. Math. Modelling 96, 751--765 (2021; Zbl 1481.90155) Full Text: DOI OpenURL
Zaghian, Maryam; Lim, Gino J.; Khabazian, Azin A chance-constrained programming framework to handle uncertainties in radiation therapy treatment planning. (English) Zbl 1403.90683 Eur. J. Oper. Res. 266, No. 2, 736-745 (2018). MSC: 90C90 90C15 92C50 PDF BibTeX XML Cite \textit{M. Zaghian} et al., Eur. J. Oper. Res. 266, No. 2, 736--745 (2018; Zbl 1403.90683) Full Text: DOI OpenURL
İç, Yusuf Tansel; Özel, Melis; Kara, İmdat An integrated fuzzy TOPSIS-knapsack problem model for order selection in a bakery. (English) Zbl 1390.90350 Arab. J. Sci. Eng. 42, No. 12, 5321-5337 (2017). MSC: 90B50 90B30 90C70 90C27 PDF BibTeX XML Cite \textit{Y. T. İç} et al., Arab. J. Sci. Eng. 42, No. 12, 5321--5337 (2017; Zbl 1390.90350) Full Text: DOI OpenURL
Altarazi, Safwan; Yasin, Omar Integration of process planning and scheduling with sequence dependent setup time: A case study from electrical wires and power cable industry. (English) Zbl 1370.90107 Le Thi, Hoai An (ed.) et al., Modelling, computation and optimization in information systems and management sciences. Proceedings of the 3rd international conference on modelling, computation and optimization in information systems and management sciences, MCO 2015, Lorraine, France, May 11–13, 2015. Part II. Cham: Springer (ISBN 978-3-319-18166-0/pbk; 978-3-319-18167-7/ebook). Advances in Intelligent Systems and Computing 360, 283-294 (2015). MSC: 90B35 90B30 90C59 60K10 PDF BibTeX XML Cite \textit{S. Altarazi} and \textit{O. Yasin}, Adv. Intell. Syst. Comput. 360, 283--294 (2015; Zbl 1370.90107) Full Text: DOI OpenURL
Chebil, Khalil; Khemakhem, Mahdi A dynamic programming algorithm for the knapsack problem with setup. (English) Zbl 1349.90634 Comput. Oper. Res. 64, 40-50 (2015). MSC: 90C10 90C39 90B30 PDF BibTeX XML Cite \textit{K. Chebil} and \textit{M. Khemakhem}, Comput. Oper. Res. 64, 40--50 (2015; Zbl 1349.90634) Full Text: DOI OpenURL
Cheng, Chun-Hung; Madan, Manohar S.; Motwani, Jaideep; Yip, Ka-Yun A Lagrangean relaxation approach for capacitated lot sizing problem with setup times. (English) Zbl 1362.90169 Int. J. Oper. Res. 18, No. 3, 272-303 (2013). MSC: 90B30 90B05 PDF BibTeX XML Cite \textit{C.-H. Cheng} et al., Int. J. Oper. Res. 18, No. 3, 272--303 (2013; Zbl 1362.90169) OpenURL
Diaby, Moustapha; Cruz, Jose M.; Nsakanda, Aaron L. Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction. (English) Zbl 1317.90115 Eur. J. Oper. Res. 228, No. 3, 526-535 (2013). MSC: 90B35 90B30 PDF BibTeX XML Cite \textit{M. Diaby} et al., Eur. J. Oper. Res. 228, No. 3, 526--535 (2013; Zbl 1317.90115) Full Text: DOI OpenURL
Nourali, Saeid; Imanipour, Narges; Shahriari, Mohammad Reza A mathematical model for integrated process planning and scheduling in flexible assembly job shop environment with sequence dependent setup times. (English) Zbl 1267.90054 Int. J. Math. Anal., Ruse 6, No. 41-44, 2117-2132 (2012). MSC: 90B35 90B30 90C11 PDF BibTeX XML Cite \textit{S. Nourali} et al., Int. J. Math. Anal., Ruse 6, No. 41--44, 2117--2132 (2012; Zbl 1267.90054) Full Text: Link OpenURL
Sun, Xiwu; Chu, Xuening; Su, Yuliang; Tang, Censhu A new directed graph approach for automated setup planning in CAPP. (English) Zbl 1197.90172 Int. J. Prod. Res. 48, No. 22, 6583-6612 (2010). MSC: 90B30 90C35 PDF BibTeX XML Cite \textit{X. Sun} et al., Int. J. Prod. Res. 48, No. 22, 6583--6612 (2010; Zbl 1197.90172) Full Text: DOI OpenURL
Cai, Ningxu; Wang, Lihui; Feng, Hsi-Yung GA-based adaptive setup planning toward process planning and scheduling integration. (English) Zbl 1163.90481 Int. J. Prod. Res. 47, No. 10, 2745-2766 (2009). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{N. Cai} et al., Int. J. Prod. Res. 47, No. 10, 2745--2766 (2009; Zbl 1163.90481) Full Text: DOI OpenURL
Osorio Gómez, Juan Carlos; Castrillón Montenegro, Oscar Eduardo; Toro Cardona, Juliana Andrea; Orejuela Cabrera, Juan Pablo Hierarchical production planning model in flexible job shop including a preemption and sequence-dependent setup times. (Spanish. English summary) Zbl 1293.90019 Ing. Investig. 28, No. 2, 72-79 (2008). MSC: 90B30 PDF BibTeX XML Cite \textit{J. C. Osorio Gómez} et al., Ing. Investig. 28, No. 2, 72--79 (2008; Zbl 1293.90019) OpenURL
Hebbal, S. S.; Mehta, N. K. Setup planning for machining the features of prismatic parts. (English) Zbl 1141.90396 Int. J. Prod. Res. 46, No. 12, 3241-3257 (2008). MSC: 90B30 PDF BibTeX XML Cite \textit{S. S. Hebbal} and \textit{N. K. Mehta}, Int. J. Prod. Res. 46, No. 12, 3241--3257 (2008; Zbl 1141.90396) Full Text: DOI OpenURL
Cai, Ningxu; Wang, Lihui; Feng, Hsi-Yung Adaptive setup planning of prismatic parts for machine tools with varying configurations. (English) Zbl 1128.90351 Int. J. Prod. Res. 46, No. 3, 571-594 (2008). MSC: 90B30 PDF BibTeX XML Cite \textit{N. Cai} et al., Int. J. Prod. Res. 46, No. 3, 571--594 (2008; Zbl 1128.90351) Full Text: DOI OpenURL
Absi, Nabil; Kedad-Sidhoum, Safia The multi-item capacitated lot-sizing problem with setup times and shortage costs. (English) Zbl 1146.90381 Eur. J. Oper. Res. 185, No. 3, 1351-1374 (2008). MSC: 90B30 90C11 90C57 PDF BibTeX XML Cite \textit{N. Absi} and \textit{S. Kedad-Sidhoum}, Eur. J. Oper. Res. 185, No. 3, 1351--1374 (2008; Zbl 1146.90381) Full Text: DOI HAL OpenURL
Absi, Nabil; Kedad-Sidhoum, Safia MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs. (English) Zbl 1190.90062 RAIRO, Oper. Res. 41, No. 2, 171-192 (2007). MSC: 90B30 90C59 PDF BibTeX XML Cite \textit{N. Absi} and \textit{S. Kedad-Sidhoum}, RAIRO, Oper. Res. 41, No. 2, 171--192 (2007; Zbl 1190.90062) Full Text: DOI Numdam EuDML OpenURL
Suerie, Christopher Modeling of period overlapping setup times. (English) Zbl 1175.90149 Eur. J. Oper. Res. 174, No. 2, 874-886 (2006). MSC: 90B30 90B50 90C11 PDF BibTeX XML Cite \textit{C. Suerie}, Eur. J. Oper. Res. 174, No. 2, 874--886 (2006; Zbl 1175.90149) Full Text: DOI OpenURL
Jodlbauer, Herbert An approach for integrated scheduling and lot-sizing. (English) Zbl 1120.90021 Eur. J. Oper. Res. 172, No. 2, 386-400 (2006). MSC: 90B35 PDF BibTeX XML Cite \textit{H. Jodlbauer}, Eur. J. Oper. Res. 172, No. 2, 386--400 (2006; Zbl 1120.90021) Full Text: DOI OpenURL
Lukač, Zrinka; Šorić, Kristina; Rosenzweig, Višnja Vojvodić Production planning problem with sequence dependent setups. (English) Zbl 1079.90038 Scitovski, Rudolf (ed.) et al., Proceedings of the 10th international conference on operational research – KOI 2004, Trogir, Croatia, September 22-24, 2004. Osijek: Univ. Osijek, Department of Mathematics; Zagreb: Croatian Operational Research Society (ISBN 953-6931-15-X/pbk). 25-33 (2005). MSC: 90B30 90C11 90C09 90C59 PDF BibTeX XML Cite \textit{Z. Lukač} et al., in: Proceedings of the 10th international conference on operational research -- KOI 2004, Trogir, Croatia, September 22-24, 2004. Osijek: Univ. Osijek, Department of Mathematics; Zagreb: Croatian Operational Research Society. 25--33 (2005; Zbl 1079.90038) OpenURL
Pochet, Yves; Van Vyve, Mathieu A general heuristic for production planning problems. (English) Zbl 1239.90043 INFORMS J. Comput. 16, No. 3, 316-327 (2004). MSC: 90B30 90C59 PDF BibTeX XML Cite \textit{Y. Pochet} and \textit{M. Van Vyve}, INFORMS J. Comput. 16, No. 3, 316--327 (2004; Zbl 1239.90043) Full Text: DOI Link OpenURL
Miller, Andrew J.; Nemhauser, George L.; Savelsbergh, Martin W. P. Facets, algorithms, and polyhedral characterizations for a multi-item production planning model with setup times. (English) Zbl 1010.90020 Aardal, Karen (ed.) et al., Integer programming and combinatorial optimization. 8th international IPCO conference, Utrecht, Netherlands, June 13-15, 2001. Proceedings. Berlin: Springer. Lect. Notes Comput. Sci. 2081, 318-332 (2001). MSC: 90B30 90C11 90C60 PDF BibTeX XML Cite \textit{A. J. Miller} et al., Lect. Notes Comput. Sci. 2081, 318--332 (2001; Zbl 1010.90020) Full Text: Link OpenURL
Carstensen, Peter The economic lot scheduling problem – survey and LP-based method. (Das Economic Lot Scheduling Problem – Überblick und LP-basiertes Verfahren.) (German) Zbl 0940.90029 OR Spektrum 21, No. 4, 429-460 (1999). MSC: 90B35 PDF BibTeX XML Cite \textit{P. Carstensen}, OR Spektrum 21, No. 4, 429--460 (1999; Zbl 0940.90029) Full Text: DOI OpenURL
Haase, Knut Capacitated lot-sizing with sequence dependent setup costs. (English) Zbl 0843.90038 OR Spektrum 18, No. 1, 51-59 (1996). MSC: 90B05 90B30 PDF BibTeX XML Cite \textit{K. Haase}, OR Spektrum 18, No. 1, 51--59 (1996; Zbl 0843.90038) Full Text: DOI OpenURL
Zhang, H.-C.; Huang, S. H.; Mei, J. Operational dimensioning and tolerancing in progress planning: Setup planning. (English) Zbl 0928.90032 Int. J. Prod. Res. 34, No. 7, 1841-1858 (1996). MSC: 90B30 62N05 PDF BibTeX XML Cite \textit{H. C. Zhang} et al., Int. J. Prod. Res. 34, No. 7, 1841--1858 (1996; Zbl 0928.90032) Full Text: DOI OpenURL
Tempelmeier, Horst; Derstroff, Matthias A Lagrangean-based heuristic for dynamic multilevel multi-item constrained lotsizing with setup times. (English) Zbl 0881.90045 Manage. Sci. 42, No. 5, 738-757 (1996). MSC: 90B05 PDF BibTeX XML Cite \textit{H. Tempelmeier} and \textit{M. Derstroff}, Manage. Sci. 42, No. 5, 738--757 (1996; Zbl 0881.90045) Full Text: DOI OpenURL
Pratsini, Eleni; Camm, Jeffrey D.; Raturi, Amitabh S. Capacitated lot sizing under setup learning. (English) Zbl 0806.90066 Eur. J. Oper. Res. 72, No. 3, 545-557 (1994). MSC: 90B35 90C30 PDF BibTeX XML Cite \textit{E. Pratsini} et al., Eur. J. Oper. Res. 72, No. 3, 545--557 (1994; Zbl 0806.90066) Full Text: DOI OpenURL
Chen, C. L. Philip; LeClair, Steven R. Integration of design and manufacturing: Solving setup generation and feature sequencing using an unsupervised-learning approach. (English) Zbl 0805.68131 Comput.-Aided Des. 26, No. 1, 59-75 (1994). MSC: 68U07 68T05 PDF BibTeX XML Cite \textit{C. L. P. Chen} and \textit{S. R. LeClair}, Comput.-Aided Des. 26, No. 1, 59--75 (1994; Zbl 0805.68131) Full Text: DOI OpenURL
Heuts, R. M. J.; Seidel, H. P.; Selen, W. J. A comparison of two lot sizing-sequencing heuristics for the process industry. (English) Zbl 0767.90030 Eur. J. Oper. Res. 59, No. 3, 413-424 (1992). MSC: 90B30 90B05 90-08 PDF BibTeX XML Cite \textit{R. M. J. Heuts} et al., Eur. J. Oper. Res. 59, No. 3, 413--424 (1992; Zbl 0767.90030) Full Text: DOI OpenURL
Lozano, S.; Larrañeta, J.; Onieva, L. Primal dual approach to the multilevel capacitated lot-sizing problem. (Planificación multinivel con limitaciones de capacidad.) (Spanish) Zbl 1167.90706 Qüestiió 15, No. 2, 211-229 (1991). MSC: 90C90 90B30 PDF BibTeX XML Cite \textit{S. Lozano} et al., Qüestiió 15, No. 2, 211--229 (1991; Zbl 1167.90706) Full Text: Link OpenURL
Lozano, Sebastian; Larraneta, Juan; Onieva, Luis Primal-dual approach to the single level capacitated lot-sizing problem. (English) Zbl 0743.90042 Eur. J. Oper. Res. 51, No. 3, 354-366 (1991). MSC: 90B05 90C90 90B30 90-08 PDF BibTeX XML Cite \textit{S. Lozano} et al., Eur. J. Oper. Res. 51, No. 3, 354--366 (1991; Zbl 0743.90042) Full Text: DOI OpenURL