Impacts of uncertain project duration and asymmetric risk sensitivity information in project management. (English) Zbl 1401.90103

Summary: This paper investigates the impacts of uncertain project duration and asymmetric risk sensitivity information on the structure of incentive contract and profits in project management where a risk-neutral project manager (she) engages a risk-averse contractor (he) to complete a project. The project manager offers a duration-based incentive contract to the contractor to ensure that he invests his effort to shorten the project duration and reports his risk sensitivity information truthfully. Within the framework of principal-agent theory, we first develop a duration-based incentive contract model, and then derive the optimal contract mechanism by solving its equivalent optimal control problem with Pontryagin maximum principle. We show that if the contractor is highly risk averse and the project duration is highly volatile, the project manager should lower the penalty term to motivate the contractor to make duration-reduction efforts. Moreover, comparing with the symmetric information scenario, we find that the project manager distorts the penalty term for all contractor’s risk types (but the lowest) downward. Our results show that the project manager is more willing to acquire the contractor’s risk sensitivity information under the uncertain project duration. The results also suggest that from the project manager’s perspective, it is beneficial to have better information about the contractor’s risk sensitivity by using a numerical analysis.

MSC:

90B50 Management decision making, including multiple objectives
91B40 Labor market, contracts (MSC2010)
91B30 Risk theory, insurance (MSC2010)

Software:

MPSPLib
PDFBibTeX XMLCite
Full Text: DOI

References:

[1] Afshar, Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost, Engineering Optimization 41 pp 1063– (2009) · doi:10.1080/03052150902943004
[2] Ammar, Optimization of project time-cost trade-off problem with discounted cash flows, Journal of Construction Engineering and Management 137 pp 65– (2011) · doi:10.1061/(ASCE)CO.1943-7862.0000256
[3] Bagnoli, Log-concave probability and its applications, Economic Theory 26 pp 445– (2005) · Zbl 1077.60012 · doi:10.1007/s00199-004-0514-4
[4] Baker, Distortion and risk in optimal incentive contracts, Journal of Human Resources 37 pp 728– (2002) · doi:10.2307/3069615
[5] Bayiz , M. Corbett , C. 2005 Coordination and incentive contracts in project management under asymmetric information Working paper, UCLA Anderson School, Los Angeles, CA
[6] Casas, Pontryagin’s principle for the control of parabolic equations with gradient state constraints, Nonlinear Analysis 46 pp 933– (2001) · Zbl 0998.49014 · doi:10.1016/S0362-546X(00)00141-3
[7] Chang, Principal-agent model of risk allocation in construction contracts and its critique, Journal of Construction Engineering and Management 140 pp 04013032– (2014) · doi:10.1061/(ASCE)CO.1943-7862.0000779
[8] Chao, Incentives in a stage-gate process, Production and Operations Management 23 pp 1286– (2014) · doi:10.1111/poms.12166
[9] Christodoulouet, Entropy-based scheduling of resource-constrained construction projects, Automation in Construction 18 pp 919– (2009) · doi:10.1016/j.autcon.2009.04.007
[10] Man, Alliance governance: balancing control and trust in dealing with risk, Long Range Planning 42 pp 75– (2009) · doi:10.1016/j.lrp.2008.10.006
[11] Dridi, A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem, International Transactions in Operational Research 21 pp 935– (2014) · Zbl 1309.90093 · doi:10.1111/itor.12071
[12] Elazouni, Finance-based scheduling of construction projects using integer programming, Journal of Construction Engineering and Management 130 pp 15– (2004) · doi:10.1061/(ASCE)0733-9364(2004)130:1(15)
[13] Fan, Generating project risk response strategies based on CBR: a case study, Expert Systems with Applications 42 pp 2870– (2015) · doi:10.1016/j.eswa.2014.11.034
[14] Gagnon, Resource-constrained project scheduling through the goal programming model: integration of the manager’s preferences, International Transactions in Operational Research 19 pp 547– (2012) · Zbl 1277.90048 · doi:10.1111/j.1475-3995.2012.00842.x
[15] Gan, Risk sharing and information revelation mechanism of a one-manufacturer and one-retailer supply chain facing an integrated competitor, Production and Operations Management 14 pp 80– (2005) · doi:10.1111/j.1937-5956.2005.tb00011.x
[16] Gerardi, A principal agent model of sequential testing, Theoretical Economics 7 pp 425– (2012) · Zbl 1395.91277 · doi:10.3982/TE914
[17] Gibbons, Incentives in organizations, Journal of Economic Perspectives 12 pp 115– (1998) · doi:10.1257/jep.12.4.115
[18] Gibbons, Incentives between firms (and within), Management Science 51 pp 2– (2005) · Zbl 06008092 · doi:10.1287/mnsc.1040.0229
[19] Gutierrez, Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance, Operations Research 48 pp 927– (2000) · doi:10.1287/opre.48.6.927.12398
[20] Homberger, A multi-agent system for the decentralized resource-constrained multi-project scheduling problem, International Transactions in Operational Research 14 pp 565– (2007) · Zbl 1146.90415 · doi:10.1111/j.1475-3995.2007.00614.x
[21] Jani, Escalation of commitment in troubled IT projects: influence of project risk factors and self-efficacy on the perception of risk and the commitment to a failing project, International Journal of Project Management 29 pp 934– (2011) · doi:10.1016/j.ijproman.2010.08.004
[22] Kwon, Managing project contracts with delayed payments, Manufacturing, Services and Operations Management 12 pp 692– (2010a) · doi:10.1287/msom.1100.0301
[23] Kwon, Optimal duration-based and cost-based coordinated project contracts with unobservable work rates, International Journal of Production Economics 126 pp 247– (2010b) · doi:10.1016/j.ijpe.2010.03.013
[24] Machado, Project management aided by verbal decision analysis approaches: a case study for the selection of the best SCRUM practices, International Transactions in Operational Research 22 (2) pp 287– (2015) · Zbl 1312.91044 · doi:10.1111/itor.12078
[25] Müller, The impact of principal agent relationship and contract type on communication between project owner and manager, International Journal of Project Management 23 pp 398– (2005) · doi:10.1016/j.ijproman.2005.03.001
[26] Murphy, Performance standards in incentive contracts, Journal of Accounting and Economics 30 pp 245– (2001) · doi:10.1016/S0165-4101(01)00013-1
[27] Myerson, Incentive compatibility and the bargaining problem, Econometrica 47 pp 61– (1979) · Zbl 0399.90008 · doi:10.2307/1912346
[28] Ollier, Ex post participation constraint in a principal-agent model with adverse selection and moral hazard, Journal of Economic Theory 148 pp 2383– (2013) · Zbl 1284.91311 · doi:10.1016/j.jet.2013.07.007
[29] Osipova, Balancing control and flexibility in joint risk management: lessons learned from two construction projects, International Journal of Project Management 31 pp 391– (2013) · doi:10.1016/j.ijproman.2012.09.007
[30] Pathak, Integrated fuzzy-HMH for project uncertainties in time-cost tradeoff problem, Applied Soft Computing 21 pp 320– (2014) · doi:10.1016/j.asoc.2014.03.035
[31] Paul, Simple probability models for project contracting, European Journal of Operational Research 165 pp 329– (2005) · Zbl 1066.90055 · doi:10.1016/j.ejor.2004.04.005
[32] Sonmez, A hybrid genetic algorithm for the discrete time-cost trade-off problem, Expert Systems with Applications 39 pp 11428– (2012) · doi:10.1016/j.eswa.2012.04.019
[33] Wang, The impact of decision criteria on deadline-based incentive contracts in project management, Journal of Intelligent Manufacturing (2014) · doi:10.1007/s10845-014-0994-4
[34] Xiao, Risk sharing and information revelation mechanism of a one-manufacturer and one-retailer supply chain facing an integrated competitor, European Journal of Operational Research 196 pp 1076– (2009) · Zbl 1176.90332 · doi:10.1016/j.ejor.2008.05.004
[35] Yang, Stochastic time-cost tradeoff analysis: a distribution-free approach with focus on correlation and stochastic dominance, Automation in Construction 20 pp 916– (2011) · doi:10.1016/j.autcon.2011.03.008
[36] Yang, The impact of risk attitude in new product development under dual information asymmetry, Computers & Industrial Engineering 76 pp 122– (2014) · doi:10.1016/j.cie.2014.07.024
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.