Zhang, Song; Chen, Huaping; Liu, Jian Research on the complicated time-constrained project scheduling in water conservancy. (Chinese. English summary) Zbl 1363.90101 J. Syst. Eng. 31, No. 1, 135-144 (2016). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{S. Zhang} et al., J. Syst. Eng. 31, No. 1, 135--144 (2016; Zbl 1363.90101) Full Text: DOI
Tan, Qi; Chen, Huaping; Zhang, Song; Li, Xiaolin Two-customer parallel batch processing machines with non-identical job sizes. (Chinese. English summary) Zbl 1299.90161 J. Syst. Eng. 28, No. 4, 543-553 (2013). MSC: 90B35 90C29 90C59 PDFBibTeX XMLCite \textit{Q. Tan} et al., J. Syst. Eng. 28, No. 4, 543--553 (2013; Zbl 1299.90161)
Li, Xiaolin; Du, Bing; Tan, Qi; Chen, Huaping Metaheuristics for scheduling batch processing machines in a distributed environment. (Chinese. English summary) Zbl 1265.90116 J. Syst. Eng. 27, No. 1, 99-110 (2012). MSC: 90B35 90C59 68Q17 PDFBibTeX XMLCite \textit{X. Li} et al., J. Syst. Eng. 27, No. 1, 99--110 (2012; Zbl 1265.90116)
Xu, Rui; Chen, Huaping; Zhu, Junhong Research on batch scheduling problems with job release time based on a max-min ant system. (Chinese. English summary) Zbl 1265.90134 J. Syst. Eng. 26, No. 4, 474-484 (2011). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{R. Xu} et al., J. Syst. Eng. 26, No. 4, 474--484 (2011; Zbl 1265.90134)
Lu, Bingyuan; Chen, Huaping; Gu, Feng; Yang, Shu Research of earliness/tardiness problem in fuzzy job-shop scheduling. (Chinese. English summary) Zbl 1135.90349 J. Syst. Eng. 21, No. 6, 655-658 (2006). MSC: 90B36 90C70 PDFBibTeX XMLCite \textit{B. Lu} et al., J. Syst. Eng. 21, No. 6, 655--658 (2006; Zbl 1135.90349)