Gallego, Guillermo; Lee, Haengju Callable products for an implicit time model with dependent demands. (English) Zbl 1527.91086 Nav. Res. Logist. 70, No. 1, 121-128 (2023). MSC: 91B26 PDFBibTeX XMLCite \textit{G. Gallego} and \textit{H. Lee}, Nav. Res. Logist. 70, No. 1, 121--128 (2023; Zbl 1527.91086) Full Text: DOI
Gallego, Guillermo; Lee, Haengju Callable products with dependent demands. (English) Zbl 07747002 Nav. Res. Logist. 67, No. 3, 185-200 (2020). MSC: 91-XX PDFBibTeX XMLCite \textit{G. Gallego} and \textit{H. Lee}, Nav. Res. Logist. 67, No. 3, 185--200 (2020; Zbl 07747002) Full Text: DOI
Gallego, Guillermo; Talebian, Masoud Oligopolistic contracting: channel coordination under competition. (English) Zbl 1429.90035 Nav. Res. Logist. 66, No. 8, 619-631 (2019). MSC: 90C05 91A12 91A10 PDFBibTeX XMLCite \textit{G. Gallego} and \textit{M. Talebian}, Nav. Res. Logist. 66, No. 8, 619--631 (2019; Zbl 1429.90035) Full Text: DOI
Boyacı, Tamer; Gallego, Guillermo Managing waiting times of backordered demands in single-stage \((Q,r)\) inventory systems. (English) Zbl 1007.90003 Nav. Res. Logist. 49, No. 6, 557-573 (2002). MSC: 90B05 PDFBibTeX XMLCite \textit{T. Boyacı} and \textit{G. Gallego}, Nav. Res. Logist. 49, No. 6, 557--573 (2002; Zbl 1007.90003) Full Text: DOI
Gallego, Guillermo; Moon, Ilkyeong Strategic investment to reduce setup times in the economic lot scheduling problem. (English) Zbl 0838.90027 Nav. Res. Logist. 42, No. 5, 773-790 (1995). MSC: 90B05 PDFBibTeX XMLCite \textit{G. Gallego} and \textit{I. Moon}, Nav. Res. Logist. 42, No. 5, 773--790 (1995; Zbl 0838.90027) Full Text: DOI
Gallego, Guillermo When is a base stock policy optimal in recovering disrupted cyclic schedules? (English) Zbl 0801.90053 Nav. Res. Logist. 41, No. 3, 317-333 (1994). MSC: 90B30 90B05 PDFBibTeX XMLCite \textit{G. Gallego}, Nav. Res. Logist. 41, No. 3, 317--333 (1994; Zbl 0801.90053) Full Text: DOI
Gallego, Guillermo; Roundy, Robin The economic lot scheduling problem with finite backorder costs. (English) Zbl 0764.90024 Nav. Res. Logist. 39, No. 5, 729-739 (1992). MSC: 90B05 90B35 90B30 PDFBibTeX XMLCite \textit{G. Gallego} and \textit{R. Roundy}, Nav. Res. Logist. 39, No. 5, 729--739 (1992; Zbl 0764.90024) Full Text: DOI
Inman, Robert R.; Jones, Philip C.; Gallego, Guillermo M. Economic lot scheduling of fully loaded processes with external setups. (English) Zbl 0729.90954 Nav. Res. Logist. 38, No. 5, 699-713 (1991). MSC: 90B05 PDFBibTeX XMLCite \textit{R. R. Inman} et al., Nav. Res. Logist. 38, No. 5, 699--713 (1991; Zbl 0729.90954) Full Text: DOI