Nodem, F. I. Dehayem; Gharbi, A.; Kenné, J.-P. Preventive maintenance and replacement policies for deteriorating production systems subject to imperfect repairs. (English) Zbl 1214.90043 Int. J. Prod. Res. 49, No. 12, 3543-3563 (2011). MSC: 90B30 90B25 PDFBibTeX XMLCite \textit{F. I. D. Nodem} et al., Int. J. Prod. Res. 49, No. 12, 3543--3563 (2011; Zbl 1214.90043) Full Text: DOI Link
Hajji, Adnene; Gharbi, Ali; Kenne, Jean-Pierre; Pellerin, Robert Production control and replenishment strategy with multiple suppliers. (English) Zbl 1206.90035 Eur. J. Oper. Res. 208, No. 1, 67-74 (2011). MSC: 90B30 93E20 PDFBibTeX XMLCite \textit{A. Hajji} et al., Eur. J. Oper. Res. 208, No. 1, 67--74 (2011; Zbl 1206.90035) Full Text: DOI Link
Berthaut, F.; Gharbi, A.; Pellerin, R. Joint hybrid repair and remanufacturing systems and supply control. (English) Zbl 1197.90119 Int. J. Prod. Res. 48, No. 14, 4101-4121 (2010). MSC: 90B30 90B06 PDFBibTeX XMLCite \textit{F. Berthaut} et al., Int. J. Prod. Res. 48, No. 14, 4101--4121 (2010; Zbl 1197.90119) Full Text: DOI Link
Nodem, F. I. Dehayem; Kenne, J. P.; Gharbi, A. Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties. (English) Zbl 1163.90562 Eur. J. Oper. Res. 198, No. 1, 173-189 (2009). MSC: 90B50 PDFBibTeX XMLCite \textit{F. I. D. Nodem} et al., Eur. J. Oper. Res. 198, No. 1, 173--189 (2009; Zbl 1163.90562) Full Text: DOI
Dhouib, K.; Gharbi, A.; Ayed, S. Availability and throughput of unreliable, unbuffered production lines with non-homogeneous deterministic processing times. (English) Zbl 1159.90366 Int. J. Prod. Res. 46, No. 20, 5651-5677 (2008). MSC: 90B30 PDFBibTeX XMLCite \textit{K. Dhouib} et al., Int. J. Prod. Res. 46, No. 20, 5651--5677 (2008; Zbl 1159.90366) Full Text: DOI
Lavoie, P.; Kenné, J.-P.; Gharbi, A. Production control and combined discrete/continuous simulation modeling in failure-prone transfer lines. (English) Zbl 1145.90371 Int. J. Prod. Res. 45, No. 24, 5667-5685 (2007). MSC: 90B30 93E20 PDFBibTeX XMLCite \textit{P. Lavoie} et al., Int. J. Prod. Res. 45, No. 24, 5667--5685 (2007; Zbl 1145.90371) Full Text: DOI Link
Kenné, J.-P.; Gharbi, A.; Beit, M. Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale. (English) Zbl 1107.90012 Eur. J. Oper. Res. 178, No. 2, 408-420 (2007). MSC: 90B25 90B30 90B05 PDFBibTeX XMLCite \textit{J. P. Kenné} et al., Eur. J. Oper. Res. 178, No. 2, 408--420 (2007; Zbl 1107.90012) Full Text: DOI
Gharbi, A.; Kenné, J.-P.; Hajji, A. Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups. (English) Zbl 1095.90028 Int. J. Prod. Res. 44, No. 2, 545-567 (2006). MSC: 90B30 90C15 90C39 PDFBibTeX XMLCite \textit{A. Gharbi} et al., Int. J. Prod. Res. 44, No. 2, 545--567 (2006; Zbl 1095.90028) Full Text: DOI Link
Kenne, J. P.; Boukas, E. K.; Gharbi, A. Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system. (English) Zbl 1048.90088 Math. Comput. Modelling 38, No. 3-4, 351-365 (2003). MSC: 90B25 90B30 90B50 49N90 PDFBibTeX XMLCite \textit{J. P. Kenne} et al., Math. Comput. Modelling 38, No. 3--4, 351--365 (2003; Zbl 1048.90088) Full Text: DOI
Abdul-Kader, Walid; Gharbi, Ali Capacity estimation of a multi-product unreliable production line. (English) Zbl 1023.90503 Int. J. Prod. Res. 40, No. 18, 4815-4834 (2002). MSC: 90B30 PDFBibTeX XMLCite \textit{W. Abdul-Kader} and \textit{A. Gharbi}, Int. J. Prod. Res. 40, No. 18, 4815--4834 (2002; Zbl 1023.90503) Full Text: DOI