Hatibaruah, Ajoy; Saha, Sumit A production inventory model for ameliorating and deteriorating items with price, time and advertisement frequency dependent demand under the effect of inflation. (English) Zbl 1497.90007 Int. J. Appl. Comput. Math. 8, No. 4, Paper No. 201, 42 p. (2022). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{A. Hatibaruah} and \textit{S. Saha}, Int. J. Appl. Comput. Math. 8, No. 4, Paper No. 201, 42 p. (2022; Zbl 1497.90007) Full Text: DOI
Kumar, Ravendra; Yadav, Ravish Kumar The impact of greenness, inflation, and trade credit on multi-item fuzzy EOQ model with partial backordering and deterioration. (English) Zbl 1497.90010 Int. J. Appl. Comput. Math. 8, No. 4, Paper No. 173, 25 p. (2022). MSC: 90B05 90B06 PDFBibTeX XMLCite \textit{R. Kumar} and \textit{R. K. Yadav}, Int. J. Appl. Comput. Math. 8, No. 4, Paper No. 173, 25 p. (2022; Zbl 1497.90010) Full Text: DOI
Kumar, Boina Anil; Paikray, Susanta Kumar; Padhy, Balaji Retailer’s optimal ordering policy for deteriorating inventory having positive lead time under pre-payment interim and post-payment strategy. (English) Zbl 1492.90019 Int. J. Appl. Comput. Math. 8, No. 4, Paper No. 165, 33 p. (2022). MSC: 90B06 90B05 03E72 PDFBibTeX XMLCite \textit{B. A. Kumar} et al., Int. J. Appl. Comput. Math. 8, No. 4, Paper No. 165, 33 p. (2022; Zbl 1492.90019) Full Text: DOI
Bhattacharjee, Nabajyoti; Nath, Biman Kanti; Sen, Nabendu; Malakar, Sanjukta; Jaggi, C. K. A production inventory model to study the supply chain of agri-product for a time reliant population. (English) Zbl 1491.90008 Int. J. Appl. Comput. Math. 8, No. 3, Paper No. 97, 18 p. (2022). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{N. Bhattacharjee} et al., Int. J. Appl. Comput. Math. 8, No. 3, Paper No. 97, 18 p. (2022; Zbl 1491.90008) Full Text: DOI
Dolai, Madhusudan; Manna, Amalesh Kumar; Mondal, Shyamal Kumar Sustainable manufacturing model with considering greenhouse gas emission and screening process of imperfect items under stochastic environment. (English) Zbl 1491.90079 Int. J. Appl. Comput. Math. 8, No. 3, Paper No. 93, 21 p. (2022). MSC: 90B30 91B76 PDFBibTeX XMLCite \textit{M. Dolai} et al., Int. J. Appl. Comput. Math. 8, No. 3, Paper No. 93, 21 p. (2022; Zbl 1491.90079) Full Text: DOI
Ghosh, Santanu Kumar; Goswami, Palash; Mukherjee, Saswati Channel coordination among the members in a three-echelon supply chain model for price, quality and advertising sensitive demand with some sub-supply chain strategies. (English) Zbl 1484.90005 Int. J. Appl. Comput. Math. 7, No. 4, Paper No. 139, 28 p. (2021). MSC: 90B05 90B06 PDFBibTeX XMLCite \textit{S. K. Ghosh} et al., Int. J. Appl. Comput. Math. 7, No. 4, Paper No. 139, 28 p. (2021; Zbl 1484.90005) Full Text: DOI
Sharma, Sanchita; Arora, Shalini Bi-objective capacitated transportation problem with bounds over distributions and requirement capacities. (English) Zbl 1484.90021 Int. J. Appl. Comput. Math. 7, No. 3, Paper No. 115, 14 p. (2021). MSC: 90B06 90C05 90C08 PDFBibTeX XMLCite \textit{S. Sharma} and \textit{S. Arora}, Int. J. Appl. Comput. Math. 7, No. 3, Paper No. 115, 14 p. (2021; Zbl 1484.90021) Full Text: DOI
Reiyas, M. Abdul; Jeganathan, K. Modeling of stochastic arrivals depending on base stock inventory system with a retrial queue. (English) Zbl 1484.90010 Int. J. Appl. Comput. Math. 7, No. 5, Paper No. 200, 22 p. (2021). MSC: 90B05 90B22 60K20 PDFBibTeX XMLCite \textit{M. A. Reiyas} and \textit{K. Jeganathan}, Int. J. Appl. Comput. Math. 7, No. 5, Paper No. 200, 22 p. (2021; Zbl 1484.90010) Full Text: DOI
Mallick, Rabin Kumar; Manna, Amalesh Kumar; Shaikh, Ali Akbar; Mondal, Shyamal Kumar Two-level supply chain inventory model for perishable goods with fuzzy lead-time and shortages. (English) Zbl 1484.90008 Int. J. Appl. Comput. Math. 7, No. 5, Paper No. 190, 18 p. (2021). MSC: 90B05 PDFBibTeX XMLCite \textit{R. K. Mallick} et al., Int. J. Appl. Comput. Math. 7, No. 5, Paper No. 190, 18 p. (2021; Zbl 1484.90008) Full Text: DOI
Tudu, Suklal; Mondal, Sankar Prasad; Alam, Shariful Different solution strategy for solving type-2 fuzzy system of differential equations with application in arms race model. (English) Zbl 1492.34004 Int. J. Appl. Comput. Math. 7, No. 5, Paper No. 177, 33 p. (2021). MSC: 34A07 91B99 34C60 PDFBibTeX XMLCite \textit{S. Tudu} et al., Int. J. Appl. Comput. Math. 7, No. 5, Paper No. 177, 33 p. (2021; Zbl 1492.34004) Full Text: DOI
Kumar, Nitin; Gupta, Umesh Chandra; Singh, Gagandeep Computational and numerical investigation of the batch Markovian arrival process subject to renewal generated geometric catastrophes. (English) Zbl 1486.91057 Int. J. Appl. Comput. Math. 7, No. 5, Paper No. 175, 34 p. (2021). MSC: 91D20 60K20 PDFBibTeX XMLCite \textit{N. Kumar} et al., Int. J. Appl. Comput. Math. 7, No. 5, Paper No. 175, 34 p. (2021; Zbl 1486.91057) Full Text: DOI
Tamrakar, G. K.; Banerjee, A. Study on infinite buffer batch size dependent bulk service queue with queue length dependent vacation. (English) Zbl 1487.60170 Int. J. Appl. Comput. Math. 7, No. 6, Paper No. 252, 25 p. (2021). MSC: 60K25 PDFBibTeX XMLCite \textit{G. K. Tamrakar} and \textit{A. Banerjee}, Int. J. Appl. Comput. Math. 7, No. 6, Paper No. 252, 25 p. (2021; Zbl 1487.60170) Full Text: DOI
Deora, Praveen; Kumari, Umesh; Sharma, D. C. Cost analysis and optimization of machine repair model with working vacation and feedback-policy. (English) Zbl 1484.90027 Int. J. Appl. Comput. Math. 7, No. 6, Paper No. 250, 14 p. (2021). MSC: 90B22 60K25 90C59 PDFBibTeX XMLCite \textit{P. Deora} et al., Int. J. Appl. Comput. Math. 7, No. 6, Paper No. 250, 14 p. (2021; Zbl 1484.90027) Full Text: DOI
Mohammad, Hassan; Waziri, Mohammed Yusuf; Abubakar, Auwal Bala A derivative-free multivariate spectral projection algorithm for constrained nonlinear monotone equations. (English) Zbl 1499.65226 Int. J. Appl. Comput. Math. 7, No. 2, Paper No. 55, 30 p. (2021). MSC: 65K05 65H10 49M37 90C56 90C30 PDFBibTeX XMLCite \textit{H. Mohammad} et al., Int. J. Appl. Comput. Math. 7, No. 2, Paper No. 55, 30 p. (2021; Zbl 1499.65226) Full Text: DOI
Khalifa, Hamiden; Elhenawy, Mohammed; Masoud, Mahmoud; Bhuiyan, Hanif; Sabar, Nasser R. On multi-objective multi-item solid transportation problem in fuzzy environment. (English) Zbl 1484.90019 Int. J. Appl. Comput. Math. 7, No. 1, Paper No. 24, 17 p. (2021). MSC: 90B06 90C29 90B25 PDFBibTeX XMLCite \textit{H. Khalifa} et al., Int. J. Appl. Comput. Math. 7, No. 1, Paper No. 24, 17 p. (2021; Zbl 1484.90019) Full Text: DOI
Karpagam, S.; Ayyappan, G.; Somasundaram, B. A bulk queueing system with rework in manufacturing industry with starting failure and single vacation. (English) Zbl 1464.90020 Int. J. Appl. Comput. Math. 6, No. 6, Paper No. 174, 22 p. (2020). MSC: 90B22 PDFBibTeX XMLCite \textit{S. Karpagam} et al., Int. J. Appl. Comput. Math. 6, No. 6, Paper No. 174, 22 p. (2020; Zbl 1464.90020) Full Text: DOI
Ghosh, Santanu Kumar; Seikh, Mijanur Rahaman; Chakrabortty, Milan Pricing strategy and channel co-ordination in a two-echelon supply chain under stochastic demand. (English) Zbl 1459.90003 Int. J. Appl. Comput. Math. 6, No. 2, Paper No. 28, 23 p. (2020). MSC: 90B05 90B06 91B24 PDFBibTeX XMLCite \textit{S. K. Ghosh} et al., Int. J. Appl. Comput. Math. 6, No. 2, Paper No. 28, 23 p. (2020; Zbl 1459.90003) Full Text: DOI
Kaushal, Bindu; Arora, Ritu; Arora, Shalini An aspect of bilevel fixed charge fractional transportation problem. (English) Zbl 1456.90030 Int. J. Appl. Comput. Math. 6, No. 1, Paper No. 14, 19 p. (2020). MSC: 90B06 90C26 90C32 PDFBibTeX XMLCite \textit{B. Kaushal} et al., Int. J. Appl. Comput. Math. 6, No. 1, Paper No. 14, 19 p. (2020; Zbl 1456.90030) Full Text: DOI
Haseli, Gholamreza; Sheikh, Reza; Sana, Shib Sankar Extension of base-criterion method based on fuzzy set theory. (English) Zbl 1442.90099 Int. J. Appl. Comput. Math. 6, No. 2, Paper No. 54, 24 p. (2020). MSC: 90B50 03E72 90C30 PDFBibTeX XMLCite \textit{G. Haseli} et al., Int. J. Appl. Comput. Math. 6, No. 2, Paper No. 54, 24 p. (2020; Zbl 1442.90099) Full Text: DOI
Mashud, Abu Hashan Md.; Uddin, Md. Sharif; Sana, Shib Sankar A two-level trade-credit approach to an integrated price-sensitive inventory model with shortages. (English) Zbl 1423.90011 Int. J. Appl. Comput. Math. 5, No. 4, Paper No. 121, 28 p. (2019). MSC: 90B05 PDFBibTeX XMLCite \textit{A. H. Md. Mashud} et al., Int. J. Appl. Comput. Math. 5, No. 4, Paper No. 121, 28 p. (2019; Zbl 1423.90011) Full Text: DOI
Yavari, Mohammad; Zaker, Hamed; Sadat Mozneb Emamzadeh, Elmira Joint dynamic pricing and inventory control for perishable products taking into account partial backlogging and inflation. (English) Zbl 1406.90015 Int. J. Appl. Comput. Math. 5, No. 1, Paper No. 1, 28 p. (2019). MSC: 90B05 91B25 90C59 90B50 PDFBibTeX XMLCite \textit{M. Yavari} et al., Int. J. Appl. Comput. Math. 5, No. 1, Paper No. 1, 28 p. (2019; Zbl 1406.90015) Full Text: DOI
Khan, Wasim Firoz; Dey, Oshmita Continuous review inventory model with normally distributed fuzzy random variable demand. (English) Zbl 1404.90017 Int. J. Appl. Comput. Math. 4, No. 5, Paper No. 130, 18 p. (2018). MSC: 90B05 91B42 PDFBibTeX XMLCite \textit{W. F. Khan} and \textit{O. Dey}, Int. J. Appl. Comput. Math. 4, No. 5, Paper No. 130, 18 p. (2018; Zbl 1404.90017) Full Text: DOI
Supakar, P.; Mahato, S. K. Fuzzy-stochastic advance payment inventory model having no shortage and with uniform demand using ABC algorithm. (English) Zbl 1406.90013 Int. J. Appl. Comput. Math. 4, No. 4, Paper No. 107, 19 p. (2018). MSC: 90B05 90C70 90C15 PDFBibTeX XMLCite \textit{P. Supakar} and \textit{S. K. Mahato}, Int. J. Appl. Comput. Math. 4, No. 4, Paper No. 107, 19 p. (2018; Zbl 1406.90013) Full Text: DOI
Ayyappan, G.; Thamizhselvi, P. Transient analysis of \(\mathrm{M}^{[X_1]},\mathrm{M}^{[X_2]}/\mathrm{G}_1,\mathrm{G}_2/1\) retrial queueing system with priority services, working vacations and vacation interruption, emergency vacation, negative arrival and delayed repair. (English) Zbl 1401.60165 Int. J. Appl. Comput. Math. 4, No. 2, Paper No. 77, 35 p. (2018). MSC: 60K25 60K30 90B22 PDFBibTeX XMLCite \textit{G. Ayyappan} and \textit{P. Thamizhselvi}, Int. J. Appl. Comput. Math. 4, No. 2, Paper No. 77, 35 p. (2018; Zbl 1401.60165) Full Text: DOI
Tripathi, R. P. Establishment of EOQ (economic order quantity) model for spoilage products and power demand under permissible delay in payments. (English) Zbl 1394.90052 Int. J. Appl. Comput. Math. 4, No. 2, Paper No. 55, 16 p. (2018). MSC: 90B05 90C31 PDFBibTeX XMLCite \textit{R. P. Tripathi}, Int. J. Appl. Comput. Math. 4, No. 2, Paper No. 55, 16 p. (2018; Zbl 1394.90052) Full Text: DOI