Cai, Ningxu; Wang, Lihui; Feng, Hsi-Yung GA-based adaptive setup planning toward process planning and scheduling integration. (English) Zbl 1163.90481 Int. J. Prod. Res. 47, No. 10, 2745-2766 (2009). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{N. Cai} et al., Int. J. Prod. Res. 47, No. 10, 2745--2766 (2009; Zbl 1163.90481) Full Text: DOI
Cai, Ningxu; Wang, Lihui; Feng, Hsi-Yung Adaptive setup planning of prismatic parts for machine tools with varying configurations. (English) Zbl 1128.90351 Int. J. Prod. Res. 46, No. 3, 571-594 (2008). MSC: 90B30 PDF BibTeX XML Cite \textit{N. Cai} et al., Int. J. Prod. Res. 46, No. 3, 571--594 (2008; Zbl 1128.90351) Full Text: DOI