Yang, Suh-Jenq; Hsu, Chou-Jung; Yang, Dar-Li Note on “Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time”. (English) Zbl 1328.90062 Inf. Sci. 260, 215-217 (2014). MSC: 90B35 PDFBibTeX XMLCite \textit{S.-J. Yang} et al., Inf. Sci. 260, 215--217 (2014; Zbl 1328.90062) Full Text: DOI
Kuo, Wen-Hung; Hsu, Chou-Jung; Yang, Dar-Li Worst-case and numerical analysis of heuristic algorithms for flowshop scheduling problems with a time-dependent learning effect. (English) Zbl 1239.90050 Inf. Sci. 184, No. 1, 282-297 (2012). MSC: 90B35 PDFBibTeX XMLCite \textit{W.-H. Kuo} et al., Inf. Sci. 184, No. 1, 282--297 (2012; Zbl 1239.90050) Full Text: DOI
Hsu, Chou-Jung; Cheng, T. C. E.; Yang, Dar-Li Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time. (English) Zbl 1252.90024 Inf. Sci. 181, No. 20, 4799-4803 (2011). MSC: 90B35 PDFBibTeX XMLCite \textit{C.-J. Hsu} et al., Inf. Sci. 181, No. 20, 4799--4803 (2011; Zbl 1252.90024) Full Text: DOI
Low, Chinyao; Ji, Min; Hsu, Chou-Jung; Su, Chwen-Tzeng Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. (English) Zbl 1185.90084 Appl. Math. Modelling 34, No. 2, 334-342 (2010). MSC: 90B35 90B25 90C60 90C59 PDFBibTeX XMLCite \textit{C. Low} et al., Appl. Math. Modelling 34, No. 2, 334--342 (2010; Zbl 1185.90084) Full Text: DOI
Hsu, Chou-Jung; Low, Chinyao; Su, Chwen-Tzeng A single-machine scheduling problem with maintenance activities to minimize makespan. (English) Zbl 1181.90117 Appl. Math. Comput. 215, No. 11, 3929-3935 (2010). MSC: 90B35 90B25 90C09 PDFBibTeX XMLCite \textit{C.-J. Hsu} et al., Appl. Math. Comput. 215, No. 11, 3929--3935 (2010; Zbl 1181.90117) Full Text: DOI