×

Machine scheduling in production: a content analysis. (English) Zbl 1476.90107

Summary: This paper presents the results of a content analysis on a comprehensive and systematically generated sample of 132 literature surveys on machine scheduling problems in production (MSPP). The paper identifies the main attributes of MSPP by analyzing these surveys and proposes a classification scheme for MSPP consisting of seven main groups with several subgroups. The reliability of the results of the content analysis is examined in a sensitivity analysis. A close analysis of the results unveils several research gaps in the literature and enables us to propose promising avenues for future research.

MSC:

90B35 Deterministic scheduling theory in operations research
PDFBibTeX XMLCite
Full Text: DOI

References:

[1] Fu, F., Integrated scheduling and batch ordering for construction project, Appl. Math. Model, 38, 784-797 (2014) · Zbl 1427.90139
[2] Fliege, J.; Kaparis, K.; Khosravi, B., Operations research in the space industry, Eur. J. Oper. Res., 217, 2, 233-240 (2012) · Zbl 1244.90002
[3] Mishra, A.; Tripathi, A. K., A Monte Carlo algorithm for real time task scheduling on multi-core processors with software controlled dynamic voltage scaling, Appl. Math. Model, 38, 1929-1947 (2014) · Zbl 1427.68032
[4] Mishra, A.; Tripathi, A. K., Energy efficient voltage scheduling for multi-core processors with software controlled dynamic voltage scaling, Appl. Math. Model, 38, 3456-3466 (2014) · Zbl 1427.68033
[5] Özgüven, C.; Sungur, B., Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times, Appl. Math. Model, 37, 22, 9117-9131 (2013) · Zbl 1427.90154
[6] Aytug, H.; Lawley, M.a.; McKay, K.; Mohan, S.; Uzsoy, R., Executing production schedules in the face of uncertainties: a review and some future directions, Eur. J. Oper. Res., 161, 1, 86-110 (2005) · Zbl 1115.90025
[7] Ebrahimi, M.; Fatemi Ghomi, S. M.T.; Karimi, B., Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates, Appl. Math. Model, 38, 2490-2504 (2014) · Zbl 1427.90169
[8] Dileepan, P.; Sen, T., Bicriterion static scheduling research for a single machine, Omega, 16, 1, 53-59 (1988)
[9] Ouelhadj, D.; Petrovic, S., A survey of dynamic scheduling in manufacturing systems, J. Sched., 12, 4, 417-431 (2009) · Zbl 1185.90089
[10] Suresh, V.; Chaudhuri, D., Dynamic scheduling-a survey of research, Int. J. Prod. Econ., 32, 1, 53-63 (1993)
[11] Jain, A. S.; Meeran, S., Deterministic job-shop scheduling: past, present and future, Eur. J. Oper. Res., 113, 2, 390-434 (1999) · Zbl 0938.90028
[12] Pinedo, M. L., Optimal policies in stochastic shop scheduling, Ann. Oper. Res., 1, 3, 305-329 (1984) · Zbl 0671.90035
[13] Framinan, J. M.; Gupta, J. N.D.; Leisten, R., A review and classification of heuristics for permutation flow-stop scheduling with makespan objective, J. Oper. Res. Soc., 55, 12, 1243-1255 (2004) · Zbl 1088.90022
[14] Hoogeveen, H., Multicriteria scheduling, Eur. J. Oper. Res., 167, 3, 592-623 (2005) · Zbl 1154.90458
[15] Behnamian, J.; Fatemi Ghomi, S. M.T., Hybrid flowshop scheduling with machine and resource-dependent processing times, Appl. Math. Model, 35, 1107-1123 (2011) · Zbl 1211.90077
[16] Kis, T.; Pesch, E., A review of exact solution methods for the non-preemptive multiprocessor flowshop problem, Eur. J. Oper. Res., 164, 3 SPEC. ISS., 592-608 (2005) · Zbl 1057.90015
[17] Shakhlevich, N. V.; Sotskov, Y. N.; Werner, F., Complexity of mixed shop scheduling problems: A survey, Eur. J. Oper. Res., 120, 2, 343-351 (2000) · Zbl 0949.90047
[18] Garousi, V.; Mäntylä, M. V., A systematic literature review of literature reviews in software testing, Inf. Softw. Technol, 80, 195-216 (2016)
[19] Hochrein, S.; Glock, C. H.; Bogaschewsky, R.; Heider, M., Literature reviews in supply chain management: a tertiary study, Manage. Rev. Q, 65, 239-280 (2015)
[20] Reisman, A.; Kumar, A.; Motwani, J., Flowshop scheduling/sequencing research : a statistical review of the literature, 1952 - 1994, IEEE Trans. Eng. Manage., 44, 3, 316-329 (1997)
[21] Neuendorf, K. A., The Content Analysis Guidebook. (2002), SAGE Publications, Inc
[22] Krippendorff, K., Content Analysis: An Introduction to Its Methodology (2012), SAGE Publications, Inc
[23] Uzunboylu, H.; Aşıksoy, G., Research in physics education: a study of content analysis, Proc. Soc. Behav. Sci., 136, 9, 425-437 (2014)
[24] Erdogan, T., Research trends in dissertations on PBL: a content analysis study, Proc.—Soc. Behav. Sci., 197, 308-315 (2015)
[25] Cullinane, K.; Toy, N., Identifying influential attributes in freight route/mode choice decisions: a content analysis, Transp. Res. Part E: Logist. Transp. Rev., 36, 41-53 (2000)
[26] Grosse, E. H.; Glock, C. H.; Neumann, W. P., Human factors in order picking system design : a content analysis, Int. J. Prod. Res. (2016)
[27] Weber, R. P., Basic Content Analysis (1990), SAGE Publications, Inc
[28] Babbie, E. R., The Practice of Social Research (2013), Cengage Learning: Cengage Learning Wadsworth
[29] Glock, C. H.; Grosse, E. H.; Ries, J. M., The lot sizing problem: a tertiary study, Int. J. Prod. Econ., 155, 39-51 (2014)
[30] Gorman, M. F.A., “Metasurvey” analysis in operations research and management science: a survey of literature reviews, Surv. Oper. Res. Manage. Sci., 21, 1, 18-28 (2016)
[31] Tranfield, D.; Denyer, D.; Smart, P., Towards a methodology for developing evidence-informed management knowledge by means of systematic review, Br. J. Manage., 14, 3, 207-222 (2003)
[32] Cooper, H. M., Research Synthesis and Meta-Analysis: A Step-By-Step Approach (Applied Social Research Methods) (2010), Sage Publications, Inc
[33] Glock, CH.; Hochrein, S., Purchasing organization and design: a literature review, Bus. Res., 4, 149-191 (2011)
[34] Hochrein, S.; Glock, C., Systematic literature reviews in purchasing and supply management research: a tertiary study, Int. J. Integr. Supply Manage., 7, 4, 215-245 (2012)
[35] González-Pereira, B.; Guerrero-Bote, V. P.; Moya-Anegón, F., A new approach to the metric of journals scientific prestige: the SJR indicator, J. Infometrics, 4, 379-391 (2010)
[36] Moed, H. F., Measuring contextual citation impact of scientific journals, J. Informetrics, 4, 3, 265-277 (2010)
[37] Kobbacy, K. A.H.; Vadera, S., A survey of AI in operations management from 2005 to 2009, J. Manuf. Technol. Manage., 22, 6, 706-733 (2011)
[39] Frankfort-Nachmias, C.; Nachmias, D.; Dewaard, J., Research Methods in the Social Sciences (2014), Worth Pub.
[40] Seuring, S.; Gold, S., Conducting content‐analysis based literature reviews in supply chain management, Supply Chain Manage. Int. J., 17, 5, 544-555 (2012)
[41] Sox, C. R.; Jackson, P. L.; Bowman, A.; Muckstadt, J.a., A review of the stochastic lot scheduling problem, Int. J. Prod. Econ., 62, 3, 181-200 (1999)
[42] Ramasesh, R., Dynamic job shop scheduling: a survey of simulation research, Omega, 18, 1, 43-57 (1990)
[43] Pinedo, M. L., Scheduling Theory, Algorithms, and Systems (2008), Springer · Zbl 1155.90008
[44] Sisson, R. L., Methods of sequencing in job shops—a review, Oper. Res., 7, 1, 10-29 (1959) · Zbl 1414.90120
[45] Baker, K. R., Sequencing rules and due-date assignments in a job shop, Manage. Sci., 30, 9, 1093-1104 (1984)
[46] Oĝuz, C.; Ercan, M. F., A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks, J. Sched., 8, 4, 323-351 (2005) · Zbl 1123.90314
[47] Cheng, T. C.E.; Sin, C. C.S., A state-of-the-art review of parallel-machine scheduling research, Eur. J. Oper. Res., 47, 271-292 (1990) · Zbl 0707.90053
[48] Geiger, CD.; Uzsoy, R.; Aytuǧ, H., Rapid modeling and discovery of priority dispatching rules: an autonomous learning approach, J. Sched., 9, 1, 7-34 (2006) · Zbl 1154.90451
[49] Blackstone, J. H.; Phillips, D. T.; Hogg, G. L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations, Int. J. Prod. Res., 20, 1, 27-45 (1982)
[50] Haupt, R., A survey of priority rule-based scheduling, OR Spectrum, 11, 1, 3-16 (1989) · Zbl 0658.90047
[51] MacCarthy, B. L.; Liu, J., Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling, Int. J. Prod. Res., 31, 1, 59-79 (1993)
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.