Pan, R.; Del Castillo, E. Scheduling methods for the statistical setup adjustment problem: a correction and clarification. (English) Zbl 1052.90567 Int. J. Prod. Res. 42, No. 1, 211-212 (2004). MSC: 90B36 PDF BibTeX XML Cite \textit{R. Pan} and \textit{E. Del Castillo}, Int. J. Prod. Res. 42, No. 1, 211--212 (2004; Zbl 1052.90567) Full Text: DOI OpenURL
Ignizio, J. P. Optimal maintenance headcount allocation: an application of Chebyshev goal programming. (English) Zbl 1052.90584 Int. J. Prod. Res. 42, No. 1, 201-210 (2004). MSC: 90B99 90C99 PDF BibTeX XML Cite \textit{J. P. Ignizio}, Int. J. Prod. Res. 42, No. 1, 201--210 (2004; Zbl 1052.90584) Full Text: DOI OpenURL
Lee, G.-C.; Kim, Y.-D.; Choi, S.-W. Bottleneck-focused scheduling for a hybrid flowshop. (English) Zbl 1052.90559 Int. J. Prod. Res. 42, No. 1, 165-181 (2004). MSC: 90B35 PDF BibTeX XML Cite \textit{G. C. Lee} et al., Int. J. Prod. Res. 42, No. 1, 165--181 (2004; Zbl 1052.90559) Full Text: DOI OpenURL
Chen, I. J.; Paulraj, A. Understanding supply chain management: Critical research and a theoretical framework. (English) Zbl 1052.90504 Int. J. Prod. Res. 42, No. 1, 131-163 (2004). MSC: 90B05 PDF BibTeX XML Cite \textit{I. J. Chen} and \textit{A. Paulraj}, Int. J. Prod. Res. 42, No. 1, 131--163 (2004; Zbl 1052.90504) Full Text: DOI OpenURL
Lin, J. T.; Wang, F. K.; Lee, W. T. Capacity-constrained scheduling for a logic IC final test facility. (English) Zbl 1052.90560 Int. J. Prod. Res. 42, No. 1, 79-99 (2004). MSC: 90B35 PDF BibTeX XML Cite \textit{J. T. Lin} et al., Int. J. Prod. Res. 42, No. 1, 79--99 (2004; Zbl 1052.90560) Full Text: DOI OpenURL
Duman, E.; Or, I. Precedence constrained TSP arising in printed circuit board assembly. (English) Zbl 1052.90638 Int. J. Prod. Res. 42, No. 1, 67-78 (2004). MSC: 90C99 PDF BibTeX XML Cite \textit{E. Duman} and \textit{I. Or}, Int. J. Prod. Res. 42, No. 1, 67--78 (2004; Zbl 1052.90638) Full Text: DOI OpenURL
Cooke, David L.; Rohleder, Thomas R.; Silver, Edward A. Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach. (English) Zbl 1052.90554 Int. J. Prod. Res. 42, No. 1, 21-36 (2004). MSC: 90B35 90C11 PDF BibTeX XML Cite \textit{D. L. Cooke} et al., Int. J. Prod. Res. 42, No. 1, 21--36 (2004; Zbl 1052.90554) Full Text: DOI OpenURL
Chan, Felix T. S.; Chung, S. H.; Wadhwa, S. A heuristic methodology for order distribution in a demand driven collaborative supply chain. (English) Zbl 1052.90502 Int. J. Prod. Res. 42, No. 1, 1-19 (2004). MSC: 90B05 PDF BibTeX XML Cite \textit{F. T. S. Chan} et al., Int. J. Prod. Res. 42, No. 1, 1--19 (2004; Zbl 1052.90502) Full Text: DOI OpenURL