Wu, Muh-Cherng; Shih, Chang-Fu; Chen, Chen-Fu An analysis of the ceiling height requirement for a large-scale semiconductor fab. (English) Zbl 1197.90182 Int. J. Prod. Res. 48, No. 12, 3697-3706 (2010). MSC: 90B30 90B90 91B38 90B22 PDFBibTeX XMLCite \textit{M.-C. Wu} et al., Int. J. Prod. Res. 48, No. 12, 3697--3706 (2010; Zbl 1197.90182) Full Text: DOI
Isik, Filiz An entropy-based approach for measuring complexity in supply chains. (English) Zbl 1197.90054 Int. J. Prod. Res. 48, No. 12, 3681-3696 (2010). MSC: 90B06 94A17 90B10 90B30 PDFBibTeX XMLCite \textit{F. Isik}, Int. J. Prod. Res. 48, No. 12, 3681--3696 (2010; Zbl 1197.90054) Full Text: DOI HAL
Liu, Zhuo; Wong, Yoke San; Lee, Kim Seng Modularity analysis and commonality design: a framework for the top-down platform and product family design. (English) Zbl 1197.90151 Int. J. Prod. Res. 48, No. 12, 3657-3680 (2010). MSC: 90B30 PDFBibTeX XMLCite \textit{Z. Liu} et al., Int. J. Prod. Res. 48, No. 12, 3657--3680 (2010; Zbl 1197.90151) Full Text: DOI
Cortés, Pablo; Onieva, Luis; Guadix, José Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study. (English) Zbl 1197.90284 Int. J. Prod. Res. 48, No. 12, 3637-3656 (2010). MSC: 90B90 90B30 PDFBibTeX XMLCite \textit{P. Cortés} et al., Int. J. Prod. Res. 48, No. 12, 3637--3656 (2010; Zbl 1197.90284) Full Text: DOI Link
Mungan, Deniz; Yu, Junfang; Sarker, Bhaba R. Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon. (English) Zbl 1197.90159 Int. J. Prod. Res. 48, No. 12, 3619-3636 (2010). MSC: 90B30 90B06 90B05 PDFBibTeX XMLCite \textit{D. Mungan} et al., Int. J. Prod. Res. 48, No. 12, 3619--3636 (2010; Zbl 1197.90159) Full Text: DOI
Van Foreest, Nicky D.; Wijngaard, Jacob; Van Der Vaart, Taco Scheduling and order acceptance for the customised stochastic lot scheduling problem. (English) Zbl 1197.90234 Int. J. Prod. Res. 48, No. 12, 3561-3578 (2010). MSC: 90B35 90B22 PDFBibTeX XMLCite \textit{N. D. Van Foreest} et al., Int. J. Prod. Res. 48, No. 12, 3561--3578 (2010; Zbl 1197.90234) Full Text: DOI HAL
Mandal, Santosh Kumar; Pandey, Mayank Kumar; Tiwari, M. K. Incorporating dynamism in traditional machine loading problem: An AI-based optimisation approach. (English) Zbl 1197.90107 Int. J. Prod. Res. 48, No. 12, 3535-3559 (2010). MSC: 90B25 90B30 68T05 PDFBibTeX XMLCite \textit{S. K. Mandal} et al., Int. J. Prod. Res. 48, No. 12, 3535--3559 (2010; Zbl 1197.90107) Full Text: DOI
Wang, Xiaoqing; Tang, Jiafu; Yung, Kai-Leung A scatter search approach with dispatching rules for a joint decision of cell formation and parts scheduling in batches. (English) Zbl 1197.90347 Int. J. Prod. Res. 48, No. 12, 3513-3534 (2010). MSC: 90C59 90B35 90C11 PDFBibTeX XMLCite \textit{X. Wang} et al., Int. J. Prod. Res. 48, No. 12, 3513--3534 (2010; Zbl 1197.90347) Full Text: DOI
Storck, Joakim Exploring improvement trajectories with dynamic process cost modelling: a case from the steel industry. (English) Zbl 1197.90171 Int. J. Prod. Res. 48, No. 12, 3493-3511 (2010). MSC: 90B30 91B38 90B60 91B26 PDFBibTeX XMLCite \textit{J. Storck}, Int. J. Prod. Res. 48, No. 12, 3493--3511 (2010; Zbl 1197.90171) Full Text: DOI HAL
Akkerman, Renzo; Van Der Meer, Dirk; Van Donk, Dirk Pieter Make to stock and mix to order: choosing intermediate products in the food-processing industry. (English) Zbl 1197.90043 Int. J. Prod. Res. 48, No. 12, 3475-3492 (2010). MSC: 90B06 90B05 90B15 90B30 PDFBibTeX XMLCite \textit{R. Akkerman} et al., Int. J. Prod. Res. 48, No. 12, 3475--3492 (2010; Zbl 1197.90043) Full Text: DOI HAL
Kwak, Doh-Soon; Kim, Kwang-Jae; Lee, Myeong-Soo Multistage PRIM: Patient rule induction method for optimisation of a multistage manufacturing process. (English) Zbl 1197.90290 Int. J. Prod. Res. 48, No. 12, 3461-3473 (2010). MSC: 90B90 90B30 PDFBibTeX XMLCite \textit{D.-S. Kwak} et al., Int. J. Prod. Res. 48, No. 12, 3461--3473 (2010; Zbl 1197.90290) Full Text: DOI
Cao, De-Bi; Yin, Yong; Kaku, Ikou A criterion of production model selection for building material with delivery delay. (English) Zbl 1197.90121 Int. J. Prod. Res. 48, No. 12, 3429-3443 (2010). MSC: 90B30 90B05 PDFBibTeX XMLCite \textit{D.-B. Cao} et al., Int. J. Prod. Res. 48, No. 12, 3429--3443 (2010; Zbl 1197.90121) Full Text: DOI
Chung, J.; Tanchoco, J. M. A. Layout design with hexagonal floor plans and material flow patterns. (English) Zbl 1197.90276 Int. J. Prod. Res. 48, No. 12, 3407-3428 (2010). MSC: 90B80 90C27 52C15 PDFBibTeX XMLCite \textit{J. Chung} and \textit{J. M. A. Tanchoco}, Int. J. Prod. Res. 48, No. 12, 3407--3428 (2010; Zbl 1197.90276) Full Text: DOI
Sevkli, Mehmet An application of the fuzzy ELECTRE method for supplier selection. (English) Zbl 1197.90327 Int. J. Prod. Res. 48, No. 12, 3393-3405 (2010). MSC: 90C29 90B50 90C70 PDFBibTeX XMLCite \textit{M. Sevkli}, Int. J. Prod. Res. 48, No. 12, 3393--3405 (2010; Zbl 1197.90327) Full Text: DOI