An integrated production and inventory model to dampen upstream demand variability in the supply chain. (English) Zbl 1110.90004
Summary: We consider a two-echelon supply chain: a single retailer holds a finished goods inventory to meet an i.i.d. customer demand, and a single manufacturer produces the retailer’s replenishment orders on a make-to-order basis. In this setting the retailer’s order decision has a direct impact on the manufacturer’s production. It is a well known phenomenon that inventory control policies at the retailer level often propagate customer demand variability towards the manufacturer, sometimes even in an amplified form (known as the bullwhip effect). The manufacturer, however, prefers to smooth production, and thus he prefers a smooth order pattern from the retailer. At first sight a decrease in order variability comes at the cost of an increased variance of the retailer’s inventory levels, inflating the retailer’s safety stock requirements. However, integrating the impact of the retailer’s order decision on the manufacturer’s production leads to new insights. A smooth order pattern generates shorter and less variable (production/replenishment) lead times, introducing a compensating effect on the retailer’s safety stock. We show that by including the impact of the order decision on lead times, the order pattern can be smoothed to a considerable extent without increasing stock levels. This leads to a situation where both parties are better off.

MSC:
90B05 Inventory, storage, reservoirs
90B22 Queues and service in operations research
90B50 Management decision making, including multiple objectives
90C40 Markov and semi-Markov decision processes
Software:
DYNAMO; PhFit
PDF BibTeX XML Cite
Full Text: DOI
References:
[1] Alfa, A., Sengupta, B., Takine, T., Xue, J., 2002. A new algorithm for computing the rate matrix of GI/M/1 type Markov chains. In: Proceedings of the 4th International Conference on Matrix Analytic Methods, Adelaide, Australia, pp. 1-16. · Zbl 1037.60079
[2] Allen, D.S., 1997. Do inventories moderate fluctuations in output? Review, Federal Reserve Bank of St. Louis, July/August, pp. 39-50.
[3] Axs¨ater, S., Coordinating control of production-inventory systems, International journal of production research, 14, 6, 669-688, (1976)
[4] Balakrishnan, A.; Geunes, J.; Pangburn, M., Coordinating supply chains by controlling upstream variability propagation, Manufacturing & service operations management, 6, 2, 163-183, (2004)
[5] Bertrand, J.W.M., Balancing production level variations and inventory variations in complex production systems, International journal of production research, 24, 5, 1059-1074, (1986)
[6] Blanchard, O., The production and inventory behavior of the American automobile industry, Journal of political economy, 91, 365-400, (1983)
[7] Blinder, A., Can the production smoothing model of inventory behavior be saved?, Quarterly journal of economics, 101, 431-453, (1986)
[8] Bobbio, A.; Horváth, A.; Scarpa, M.; Telek, M., Acyclic discrete phase type distributions: properties and a parameter estimation algorithm, Performance evaluation, 54, 1, 1-32, (2003)
[9] Bobbio, A., Horváth, A., Telek, M., 2004a. 3-Moments matching with minimal, positive acyclic phase-type distributions. Research Report. Department of Telecommunication, Technical University of Budapest.
[10] Bobbio, A.; Horváth, A.; Telek, M., The scale factor: A new degree of freedom in phase type approximation, Performance evaluation, 56, 1-4, 121-144, (2004)
[11] Boute, R.N., Lambrecht, M.R., Van Houdt, B., 2004. Periodic review base-stock replenishment policy with endogenous lead times. Research Report 0448. Department of Applied Economics, Katholieke Universiteit Leuven, Belgium.
[12] Buffa, E.S.; Miller, J.G., Production-inventory systems: planning and control, (1979), Irwin Homewood Illinois
[13] Chaudry, M.; Templeton, J., A first course in bulk queues, (1983), Wiley New York · Zbl 0559.60073
[14] Chen, F.; Drezner, Z.; Ryan, J.; Simchi-Levi, D., Quantifying the bullwhip effect in a simple supply chain: the impact of forecasting, lead times, and information, Management science, 46, 3, 436-443, (2000) · Zbl 1231.90019
[15] Dejonckheere, J., Disney, S.M., Farasyn, I., Janssen, F., Lambrecht, M.R., Towill, D.R., Van de Velde, W., 2002. Production and inventory control: The variability trade-off. In: Proceedings of the 9th EUROMA Conference, Copenhagen, Denmark.
[16] Dejonckheere, J.; Disney, S.M.; Lambrecht, M.R.; Towill, D.R., Measuring and avoiding the bullwhip effect: A control theoretic approach, European journal of operational research, 147, 567-590, (2003) · Zbl 1026.90030
[17] Deziel, D.; Eilon, S., A linear production-inventory control rule, The production engineer, 43, 93-104, (1967)
[18] Disney, S.M.; Towill, D.R., On the bullwhip and inventory variance produced by an ordering policy, Omega, 31, 157-167, (2003)
[19] Disney, S.M., Farasyn, I., Lambrecht, M.R., Towill, D.R., Van de Velde, W., in press. Taming bullwhip whilst watching customer service in a single supply chain echelon. European Journal of Operational Research, doi:10.1016/j.ejor.2005.01.026. · Zbl 1125.90312
[20] Fair, R.C., 1989. The production smoothing model is alive and well. Cowles Foundation Discussion Papers 896. Cowles Foundation, Yale University.
[21] Forrester, J., Industrial dynamics, (1961), MIT Press Cambridge, MA
[22] Graves, S.C., A single-item inventory model for a nonstationary demand process, Manufacturing & service operations management, 1, 1, 50-61, (1999)
[23] Hopp, W.J.; Spearman, M.L., Factory physics, (2001), Irwin McGraw-Hill
[24] Horváth, A., Telek, M., 2002. PhFit: A general phase-type fitting tool. In: Proceedings of Performance TOOLS 2002, London, UK. · Zbl 1047.68528
[25] Hosoda, T.; Disney, S.M., On variance amplification in a three-echelon supply chain with minimum Mean square error forecasting, Omega, 34, 4, 344-358, (2005)
[26] Karmarkar, U.S., Manufacturing lead times, order release and capacity loading, (), 287-329
[27] Kim, J.G., Chatfield, D.C., Harrison, T.P., Hayya, J.C., in press. Quantifying the bullwhip in a supply chain with stochastic lead time. European Journal of operational research, doi:10.1016/j.ejor.2005.01.043. · Zbl 1125.90363
[28] Krane, S.; Braun, S.N., Production smoothing evidence from physical-product date, Journal of political economy, 99, 558-581, (1991)
[29] Latouche, G.; Ramaswami, V., Introduction to matrix analytic methods and stochastic modeling, (1999), SIAM Philadelphia · Zbl 0922.60001
[30] Lee, H.L.; Padmanabhan, V.; Whang, S., The bullwhip effect in supply chains, Sloan management review, 38, 3, 93-102, (1997), Spring
[31] Lee, H.L.; Padmanabhan, V.; Whang, S., Information distortion in a supply chain: the bullwhip effect, Management science, 43, 4, 546-558, (1997) · Zbl 0888.90047
[32] Lu, Y.; Song, J.-S.; Yao, D., Order fill rate, leadtime variability, and advance demand information in an assemble-to-order system, Operations research, 51, 2, 292-308, (2003) · Zbl 1163.90465
[33] Magee, J.F., Guides to inventory control, part II, Harvard business review, 103-116, (1956)
[34] Magee, J.F., Production planning and inventory control, (1958), McGraw-Hill New York
[35] Miron, J.A.; Zeldes, S.P., Seasonality, cost shocks, and the production smoothing model of inventories, Econometrica, 56, 877-908, (1988)
[36] Nelson, R., Probability, stochastic processes, and queueing theory, (1995), Springer-Verlag
[37] Neuts, M., Matrix-geometric solutions in stochastic models, an algorithmic approach, (1981), John Hopkins University Press · Zbl 0469.60002
[38] Neuts, M., Structured stochastic matrices of M/G/1 type and their applications, (1989), Marcel Dekker, Inc. New York and Basel · Zbl 0695.60088
[39] Ramaswami, V., Nonlinear matrix equations in applied probability—solution techniques and open problems, SIAM review, 30, 2, 256-263, (1988) · Zbl 0642.65033
[40] Riddalls, C.E.; Bennett, S., Production-inventory system controller design and supply chain dynamics, International journal of systems science, 33, 3, 181-195, (2002) · Zbl 1026.90006
[41] Silver, E.A.; Pyke, D.F.; Peterson, R., Inventory management and production planning and scheduling, (1998), John Wiley & Sons New York
[42] Simon, H., On the application of servomechanism theory in the study of production control, Econometrica, 20, 247-268, (1952) · Zbl 0046.37804
[43] Song, J.S.; Yao, D.D., Performance analysis and optimization of assemble-to-order systems with random lead times, Operations research, 50, 5, 889-903, (2002) · Zbl 1163.90473
[44] Song, J.-S.; Zipkin, P., The joint effect on leadtime variance and lot size in a parallel processing environment, Management science, 42, 9, 1352-1363, (1996) · Zbl 0880.90033
[45] Song, J.S.; Xu, S.H.; Liu, B., Order-fulfillment performance measures in an assemble-to-order system with stochastic lead times, Operations research, 47, 1, 131-149, (1999) · Zbl 1014.90005
[46] Telek, M., Minimal coefficient of variation of discrete phase type distributions, (), 391-400
[47] Telek, M.; Heindl, A., Matching moments for acyclic discrete and continuous phase-type distributions of second order, International journal of simulation systems, science & technology, special issue on analytical & stochastic modelling techniques, 3, 3-4, (2002)
[48] Towill, D.R., Dynamic analysis of an inventory and order based production control system, International journal of production research, 20, 6, 671-687, (1982)
[49] Tsay, A.A.; Nahmias, S.; Agrawal, N., Modeling supply chain contracts: A review, (), (Chapter 10) · Zbl 1052.90513
[50] Van Nyen, P.L.M.; Bertrand, J.W.M.; Van Ooijen, H.P.G.; Vandaele, N.J., A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times, OR spektrum, 27, 399-434, (2005) · Zbl 1124.90318
[51] Vassian, H.J., Application of discrete variable servo theory to inventory control, Operations research, 3, 272-282, (1955) · Zbl 1414.90054
[52] Veinott, A.F., The status of mathematical inventory theory, Management science, 12, 11, 745-777, (1966) · Zbl 0143.21801
[53] Warburton, R.D.H., An analytical investigation of the bullwhip effect, Production and operations management, 13, 2, 150-160, (2004)
[54] Warburton, R.D.H., An exact analytical solution to the production inventory problem, International journal of production economics, 92, 91-96, (2004)
[55] West, K.D., A variance bounds test of the linear quadratic inventory model, Journal of political economy, 94, 374-401, (1986)
[56] Zipkin, P.H., Foundations of inventory management, (2000), McGraw-Hill New York · Zbl 1370.90005
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. It attempts to reflect the references listed in the original paper as accurately as possible without claiming the completeness or perfect precision of the matching.